ProjectProgramme / project reportTraining in Sea Safety Development
Training in Sea Safety Development Programmes, India, IND/6712
1998Also available in:
No results found.The Consultant travelled to New Delhi, Kakinada and Visakhapatnam for discussions with fishermen, fishing boat owners, boatbuilders, staff from the Kakinada Port Office, Marine Department in Visakhapatnam, Fisheries Department, Fisheries Training Institute (CFTI) and F AO, on questions of fishing vessel safety. During the cyclone in November 1996, 110 trawlers and 569 crew members were lost. Only the 10-12 m multi-day trawlers were caught at sea in the cyclone since the smaller boats were not ou t fishing due to bad weather. It was noted that the safety equipment required in the "Merchant Shipping Act" is not carried when the boats go fishing. Concrete steps are recommended to improve the safety of the fishing vessels, including lashing down of hatch covers and providing larger scuppers in the bulwark, together with better training of the crew in dealing with heavy weather. The lifejackets supplied in India with cotton cover and kapok floatation are outdated. None of the crew on the fis hing boats or the instructors of the CFTI knew how to tie on the life jackets properly. The Syllabus of the CFTI puts too little emphasis on training for heavy weather boat handling and safety drills. Two training courses aimed at different levels of participants were held in Kakinada. A prototype of a rigid lifefloat for 8-10 men was made in a FRP boatbuilding yard in kakinada and demonstrated in the fishing harbour. The life float is designed to be carried on top of the wheelhouse and will inc rease the chances of survival of the crew and the probability of being seen by search boats and aeroplanes. The scantlings of the wooden trawlers built in Kakinada are considerably below what , is considered to be the minimum in other countries. This increases the possibility of Youndering in heavy weather due to leaks, especially on older boats. Poor workmanship and scantlings were also seen in FRP boats. Many of the FRP boats have no, or inadequate, buoyancy compartments to keep the boats aflo at if a sudden leak occurs. A tender specification was prepared for the supply of 12 diesel engines by the project for installation in Navas. -
ProjectProgramme / project reportTraining in Sea Safety Development: Activities Progress Report
Training in Sea Safety Development Programmes, India, IND/6712
1998Also available in:
No results found.The Team Leader travelled to Delhi on 13 October 1998 for meetings with F AOR and also with the Fisheries Development Commissioner. From there he proceeded to Hyderabad on 14 October. In Hyderabad, meetings were held with the Director of Fisheries, NPD Joint Director (Marine) Fisheries and the Director ofDoordarshan. It was not possible to meet the Relief Commissioner as he was fully engaged with the flood crisis in the State. However, a letter appraising him of the current progress and plans of the project was left for his attention (Annex 1 ). The team leader then left for Kakinada by overnight train arriving on 16 October. The team leader was in Kakinada from 16 October to 20 November following up all aspects of the project including the following: SSEO training and field work, meetings with the District Collector, F AO Monitoring Officer's visit, Balusuthippa Shore Station construction, VHF installation and training, lifefloat finalisation and production, nava selection for diesel engines, SSAG equipment, and workshop preparation with the National Consultant and Regional Deputy Director of Fisheries. On 20 November the Team Leader proceeded to Visakapatnam by car \Vith the National Consultant. In Visakapatnam SSAG equipment samples were inspected after which the team leader travelled by air to Hyderabad on 21 November for follow up meetings with the Relief Commissioner (Annex 2), Director of Fisheries, Joint Director (Marine) NPD, Director ofDoordarshan and AFPRO. -
ProjectProgramme / project reportTraining in Sea Safety Development Programmes. (4th mission : 31 January — 18 February )
Training in Sea Safety Development Programmes, India, IND/6712
1999Also available in:
No results found.The Team Leader's fourth mission was made from 31 January to 18 February 1999. After travelling from Trivandrum, this commenced with a meeting in Delhi at the FAO office followed by meetings with the Director of Fisheries and Joint Director of Fisheries Marine (NPD) in Hyderabad. From Hyderabad the consultant/team leader proceeded to Kakinada by overnight train. In Kakinada meetings were held with the sub-nodal Officer, Regional Deputy Director of Fisheries and also with the Consultant Marine En gineer, Storm Safety Extension Officer (SSEO) Field Coordinator and SSEOs. All SSEO groups were visited in at least one of their Storm Safety Action Group (SSAG) villages. The situation regarding lifefloats, diesel engines, VHF training and SSAG equipment were assessed making neccessary inputs. Unfortunately the National Consultant (Communications) was away on leave during the period of this mission. On 16 February evening the consultant/TL travelled back to Hyderabad by overnight train and had meetings with Director of Fisheries, NPD, Doordarshan, Relief Commissioner (the fourth in as many missions) and two GOAP consultants of the World Bank funded Andhra Pradesh (AP) Disaster Mitigation and Cyclone Recovery Programme at the Secretariat. On 18 February the consultant/TL returned to Trivandrum.