CL 120/3-Sup.1 |
Rome, 18 - 23 June 2001 |
SUMMARY PROGRAMME OF WORK AND BUDGET 2002-2003 |
Outline of a Zero Real Growth Scenario |
Chapter 1: General Policy and Direction
Chapter 2: Technical and Economic Programmes
Chapter 3: Cooperation and Partnerships
1. In his Introduction to the Summary Programme of Work and Budget (SPWB) 2002-20031, the Director-General emphasised that the real growth proposals contained in that document represented a middle path in the range of expectations from the membership, which would hopefully attract a broad body of support and eventually could lead to consensus. In this light, the SPWB embodies a set of proposals for the biennium 2002-2003, compatible with the main substantive thrusts of the Medium Term Plan 2002-2007, but at a lower overall resource level than that tentatively indicated in the latter document.
2. Mindful, however, of the interest of some countries in seeing alternative proposals, the Director-General has arranged for the present document to be prepared. It outlines a possible zero real growth scenario (ZRG) for the 2002-2003 biennium. It is emphasised that this is not a proposal by the Director-General, but rather a response to a request for information on the impact of a certain resources level vis à vis that proposed by the Director-General in his SPWB proposals.
3. In developing this scenario, the approach taken has been to reverse or back out all of those proposals made by FAO units when asked to allocate the additional resources arising from real growth. As such resources have been allocated directly in line with the priorities expressed in the Medium Term Plan, it follows that deductions which would result, if real growth proposals are not accepted, are made against some programmes.
4. It is further noted that neither the SPWB proposals nor the reduced scenario referred to in this document specifically reflect the outcome of recent meetings of the Technical Committees of the Council - that is, the Committees on Agriculture (COAG), Fisheries (COFI) and Forestry (COFO) - although in many cases the outcome could be and was effectively anticipated. An exercise is currently underway to identify the incremental cost of these recommendations and an information paper will be provided to the Council giving the necessary details. Such priorities will need to be reflected, to the extent resources allow, in the full Programme of Work and Budget (PWB). In addition, the level forecast for the field programme and, therefore, of support cost income currently assumed is, as already indicated in the SPWB2, subject to some uncertainty and risk and may also need to be revisited in the preparation of the full PWB.
5. For the purposes of demonstrating the impact of a ZRG budget on the proposals presented in the SPWB, the tables in section IV of the SPWB have been reproduced below whenever differences are involved, showing the reduced levels at ZRG set against the real growth allocations in the main document. Narratives aim at explaining the eventual impact of lower resource levels, which at times need to go into a lower degree of detail than the highly summarised statements of planned outputs in the SPWB (particularly regarding substantive work under Chapter 2, Technical and Economic Programmes, and Major Programme 3.1, Policy Assistance).
Overall Resource Table
6. In order to achieve zero real growth (ZRG) over the current total level of the Appropriation, US$ 650 million, the total level for 2002-2003 should equal this amount, before the eventual addition of anticipated cost increases. The breakdowns by budgetary chapter of both the Programme of Work and the Appropriation at ZRG levels are given below, set against the real growth (RG) proposals in the SPWB3.
(All amounts in US$ 000) |
||||||
Chapter | Real Growth (RG) | Zero Real Growth (ZRG) | Reduction in Programme of Work from RG to ZRG |
|||
Programme of Work | Appropriation | Programme of Work | Appropriation | |||
1 | General Policy and Direction | 55,877 | 52,872 | 54,877 | 51,872 | (1,000) |
2 | Technical and Economic Programmes | 314,932 | 306,704 | 301,209 | 292,981 | (13,723) |
3 | Cooperation and Partnerships | 184,242 | 122,427 | 178,345 | 116,530 | (5,897) |
4 | Technical Cooperation Programme | 101,719 | 101,719 | 91,469 | 91,469 | (10,250) |
5 | Support Services | 66,783 | 59,375 | 62,580 | 55,172 | (4,203) |
6 | Common Services | 45,689 | 41,376 | 45,689 | 41,376 | 0 |
7 | Contingencies | 600 | 600 | 600 | 600 | 0 |
Total | 769,842 | 685,073 | 734,769 | 650,000 | (35, 073) | |
(All amounts in US$ 000) |
|||||
Major Programme | RG Programme of Work | Difference | 2002-03 Zero Real Growth | Percent of Total | |
1.1 | Governing Bodies | 18,136 | 0 | 18,136 | 33% |
1.2 | Policy, Direction and Planning | 24,136 | (1,000) | 23,136 | 42% |
1.3 | External Coordination and Liaison | 12,792 | 0 | 12,792 | 23% |
1.9 | Programme Management | 813 | 0 | 813 | 1% |
Total | 55,877 | (1,000) | 54,877 | 100% | |
(All amounts in US$ 000) |
|||||
Programme | RG Programme of Work | Difference | 2002-03 Zero Real Growth | Percent of Total | |
1.2.1 | Director-General's Office | 6,434 | 0 | 6,434 | 28% |
1.2.2 | Programme Planning, Budgeting and Evaluation | 8,122 | (1,000) | 7,122 | 31% |
1.2.3 | Audit and Inspection | 5,677 | 0 | 5,677 | 25% |
1.2.4 | Legal Services | 2,428 | 0 | 2,428 | 10% |
1.2.5 | Programme and Operational Coordination | 1,475 | 0 | 1,475 | 6% |
Total | 24,136 | (1,000) | 23,136 | 100% | |
7. While some start-up funds would remain, elimination of the substantial increase under Programme 1.2.2, Programme Planning, Budgeting and Evaluation, which is to meet most of the cost of replacing the current budget preparation and work planning system, PLANSYS, would imply further postponement of this much needed replacement.
(All amounts in US$ 000) |
|||||
Major Programme | RG Programme of Work | Difference | 2002-03 Zero Real Growth | Percent of Total | |
2.1 | Agricultural Production and Support Systems | 94,959 | (3,561) | 91,398 | 30% |
2.2 | Food and Agriculture Policy and Development | 91,412 | (3,392) | 88,020 | 29% |
2.3 | Fisheries | 41,507 | (2,018) | 39,489 | 13% |
2.4 | Forestry | 32,270 | (1,882) | 30,388 | 10% |
2.5 | Contributions to Sustainable Development and Special Programme Thrusts | 54,784 | (2,870) | 51,914 | 17% |
Total | 314,932 | (13,723) | 301,209 | 100% | |
8. The lower ZRG provisions evidenced in the preceding table under the five major programmes imply reduced levels of activity and loss of outputs for the benefit of the membership, as explained below. In particular, the envisaged strengthening of professional capacity, one of the features of the real growth proposal in the SPWB, would fall short of nineteen additional posts, including nine in Regional or Sub-regional Offices, which aimed at redressing lack of sufficient expertise in key disciplines (e.g. statistics, animal production, aquaculture, rice-based systems).
(All amounts in US$ 000) |
|||||
Programme | RG Programme of Work | Difference | 2002-03 Zero Real Growth | Percent of Total | |
2.1.0 | Intra-departmental Programme Entities for Agricultural Production and Support Systems | 5,784 | (1,172) | 4,612 | 5% |
2.1.1 | Natural Resources | 16,215 | (415) | 15,800 | 17% |
2.1.2 | Crops | 24,256 | (740) | 23,516 | 26% |
2.1.3 | Livestock | 17,504 | (721) | 16,783 | 18% |
2.1.4 | Agricultural Support Systems | 15,167 | (348) | 14,819 | 16% |
2.1.5 | Agricultural Applications of Isotopes and Biotechnology | 5,665 | (165) | 5,500 | 6% |
2.1.9 | Programme Management | 10,368 | 0 | 10,368 | 11% |
Total | 94,959 | (3,561) | 91,398 | 100% | |
(All amounts in US$ 000) |
||||
Programme Entity | RG Programme of Work | Difference | 2002-03 Zero Real Growth | |
2.1.0.A1 | Sustainable Intensification of Integrated Production Systems | 805 | (399) | 406 |
2.1.0.A2 | Promotion of Conservation Agriculture | 1,009 | (50) | 959 |
2.1.0.P1 | Secretariat of the Commission on Genetic Resources for Food and Agriculture (CGRFA) | 1,774 | (133) | 1,641 |
2.1.0.S1 | Committee on Agriculture (COAG) | 452 | 0 | 452 |
2.1.0.S2 | Technical Services for Partnership Development and Information Enhancement | 744 | (90) | 654 |
2.1.0.S5 | Central Support to PAIAs | 1,000 | (500) | 500 |
Total | 5,784 | (1,172) | 4,612 | |
9. At the above ZRG resource levels, two entities in particular would be severely curtailed: 210A1, Sustainable Intensification of Integrated Production Systems, in particular through the elimination of critical inputs from decentralized offices to work on various regional agro-ecosystems (intensified rice-wheat systems in Asia and Pacific, arid and semi-arid production in Near East and Latin America, oncho-freed areas of West Africa, etc.), and 210S5, Central Support to PAIAs, the provision for which would be cut by half, hampering the adequate development of cross-sectoral programmes under these PAIAs. Other reductions would affect some of the proposals to further improve language coverage (e.g. planned publications on ethics in food and agriculture, or meetings and publications relating to conservation agriculture) and the planned expansion of FAO's website in connection with biotechnology.
(All amounts in US$ 000) |
||||
Programme Entity | RG Programme of Work | Difference | 2002-03 Zero Real Growth | |
2.1.1.A1 | Agricultural Water Use Efficiency and Conservation | 2,608 | (16) | 2,592 |
2.1.1.A2 | Land and Soil Productivity | 2,322 | (16) | 2,306 |
2.1.1.A3 | Integrated Land, Water and Plant Nutrient Management | 2,526 | (91) | 2,435 |
2.1.1.A4 | Waterlogging and Salinity Control, Environmental Effects of Irrigation and Reclamation of Problem Soils | 0 | 0 | 0 |
2.1.1.P7 | Land and Water Information Systems, Databases and Statistics | 1,878 | (212) | 1,666 |
2.1.1.P8 | Knowledge Management and Partnerships | 1,259 | 0 | 1,259 |
2.1.1.S1 | Direct Support to Member Nations and to the Field Programme | 5,093 | (80) | 5,013 |
2.1.1.S2 | International Programme for Technology and Research in Irrigation and Drainage (IPTRID) | 529 | 0 | 529 |
Total | 16,215 | (415) | 15,800 | |
10. While this programme would be only moderately affected by the lower allocation at ZRG, it would not be possible, for instance, to pursue the establishment of a new P-2 post of Land and Water Management Officer in the Regional Office for Latin America and the Caribbean (particularly relevant to entities 211S1, Direct Support to Member Nations and to the Field Programme, and 211P7, Land and Water Information Systems, Databases and Statistics, as well as several others). Work on guidelines on adjustment to climate variability (technical project 211A3, Integrated Land, Water and Plant Nutrient Management) and on several databases and water balance models under entity 211P8, Knowledge Management and Partnerships, would need to be abandoned or postponed.
(All amounts in US$ 000) |
||||
Programme Entity | RG Programme of Work | Difference | 2002-03 Zero Real Growth | |
2.1.2.A1 | Alternative Crops and Cultivars for New Opportunities | 1,305 | 11 | 1,316 |
2.1.2.A2 | Urban and Peri-urban Agriculture | 0 | 0 | 0 |
2.1.2.A3 | Strategies and Technologies for Sustainable Crop and Grassland Production Systems | 3,682 | (75) | 3,607 |
2.1.2.A4 | EMPRES - Plant Pests Component | 1,882 | (100) | 1,782 |
2.1.2.A5 | "Mainstreaming IPM" by Enhancing Essential Ecological Processes | 2,023 | 0 | 2,023 |
2.1.2.A6 | Conservation, Management and Sustainable Utilization of Plant Genetic Resources for Food and Agriculture | 0 | 0 | 0 |
2.1.2.A7 | Strengthening National Seed Production and Security Systems | 1,945 | (25) | 1,920 |
2.1.2.A8 | Facilitating Plant Production and Protection Decision Making | 900 | 1 | 901 |
2.1.2.P1 | Secretariat of the International Plant Protection Convention (IPPC) | 2,968 | (225) | 2,743 |
2.1.2.P2 | Pesticide Management | 2,616 | (110) | 2,506 |
2.1.2.P3 | Migratory Pest Management | 1,837 | 0 | 1,837 |
2.1.2.P4 | Support to the FAO Global System on Plant Genetic Resources for Food and Agriculture (PGRFA) | 2,806 | (175) | 2,631 |
2.1.2.P5 | Support to Strategy Formulation and Promotion of Specific Action for Rice Development in Member Countries of the International Rice Commission (IRC) | 625 | (28) | 597 |
2.1.2.S1 | Advice to Countries and Support to Field Programme | 1,667 | (14) | 1,653 |
Total | 24,256 | (740) | 23,516 | |
11. In relative terms, lower resource allocations would impact basically on four entities dealing, however, with priority activities of keen interest to the membership. They would entail lower support to cooperation on Desert Locust Management in West Africa under 212A4, EMPRES - Plant Pests Component; reduced expert group meetings relating to the International Plant Protection Convention (IPPC) implementation under 212P1, Secretariat of the IPPC; less work on recommendations for residues and quality standards of pesticides under 212P2, Pesticide Management, and on the refinement of reporting formats and indicators for monitoring the implementation of the Global Plan of Action on Genetic Resources for Food and Agriculture (GRFA) under 212P4. Support to a biotechnology network in Africa would also be undermined under technical project 212A3, Strategies and Technologies for Sustainable Crop and Grassland Production Systems.
(All amounts in US$ 000) |
||||
Programme Entity | RG Programme of Work | Difference | 2002-03 Zero Real Growth | |
2.1.3.A3 | Contribution of Livestock to Poverty Alleviation | 2,013 | (35) | 1,978 |
2.1.3.A5 | Developing the Global Strategy for the Management of Farm Animal Genetic Resources | 1,934 | (209) | 1,725 |
2.1.3.A6 | Veterinary Public Health Management and Food and Feed Safety | 1,214 | (67) | 1,147 |
2.1.3.A7 | EMPRES - Livestock | 2,830 | (247) | 2,583 |
2.1.3.A8 | Technologies and Systems for Efficient Natural Resource Use in Livestock Production | 2,760 | (35) | 2,725 |
2.1.3.A9 | Environmental Management of Insect Borne Diseases | 898 | 0 | 898 |
2.1.3.B1 | Livestock Sector Analysis and Strategy Development | 888 | 0 | 888 |
2.1.3.P1 | Global Livestock Information System and Knowledge Framework | 1,940 | (12) | 1,928 |
2.1.3.S1 | Advice to Member Countries and Support to the Field Programme | 3,027 | (116) | 2,911 |
Total | 17,504 | (721) | 16,783 | |
12. The effect of lower ZRG provisions would be principally of a three-pronged nature: the abandonment of the proposed new P-3 post of Animal Production Officer in the Sub-regional Office for Southern and East Africa (affecting more particularly entity 213S1, Advice to Member Countries and Support to the Field Programme); much reduced work of synthesis and consolidation of country reports in relation to the Global Strategy for the Management of Farm Animal Resources and on local action plans for genetic utilisation and improvement (particularly in Africa) under technical project 213A5, Developing the Global Strategy for the Management of Farm Animal Genetic Resources; and the implementation of a pathway for verification of freedom from rinderpest (project 213A7, EMPRES - Livestock).
(All amounts in US$ 000) |
||||
Programme Entity | RG Programme of Work | Difference | 2002-03 Zero Real Growth | |
2.1.4.A1 |
Enhancing Small Farmer Livelihoods | 2,471 | 0 | 2,471 |
2.1.4.A2 | Meeting Urban Food Needs | 1,774 | (203) | 1,571 |
2.1.4.A3 | Sustainable Commercial Provision of Input Supply, Mechanisation, Investment Support and Marketing Services | 1,779 | 0 | 1,779 |
2.1.4.A4 | Agribusiness Development | 2,435 | (120) | 2,315 |
2.1.4.A5 | Agricultural Services - Data and Information Systems | 1,889 | (25) | 1,864 |
2.1.4.A6 | Farm Economics and Decision Support | 0 | 0 | 0 |
2.1.4.A7 | Agricultural Engineering, Ergonomics and the Environment | 0 | 0 | 0 |
2.1.4.A8 | Agricultural Marketing and Rural Finance Support Products and Outreach | 0 | 0 | 0 |
2.1.4.P1 | Small-scale Agro-industries and Post-harvest Systems Analysis | 0 | 0 | 0 |
2.1.4.S1 | Field Programme Support and Advisory Services to Countries | 4,819 | 0 | 4,819 |
Total | 15,167 | (348) | 14,819 | |
13. The lower levels of activity under the two most-critically affected entities (214A2, Meeting Urban Food Needs, and 214A4, Agribusiness Development) would imply respectively: a) postponement of the development of training modules on peri-urban farming for food security in Central Africa, reduced dissemination of information through the Internet, and less balanced language coverage of publications on urban and peri-urban horticulture; and b) a reduced programme of workshops and expert meetings dealing with food biotechnology and consumer education.
(All amounts in US$ 000) |
||||
Programme Entity | RG Programme of Work | Difference | 2002-03 Zero Real Growth | |
2.1.5.A1 | Sustainable Intensification of Crop Production Systems through Technologies and Capacity Building | 2,096 | (105) | 1,991 |
2.1.5.A2 | Sustainable Intensification of Livestock Production Systems through Technologies and Capacity Building for Mitigation of Constraints and Risks | 1,758 | (60) | 1,698 |
2.1.5.P1 | Capacity Building and Risk Analysis Methodologies for Compliance with Food Safety Standards and Pesticide Control and Strengthened Sanitary and Phytosanitary Measures through Irradiation of Food and Agricultural Commodities | 1,811 | 0 | 1,811 |
Total | 5,665 | (165) | 5,500 | |
14. The two technical projects (215A1, Sustainable Intensification of Crop Production Systems through Technologies and Capacity Building, and 215A2, Sustainable Intensification of Livestock Production Systems through Technologies and Capacity Building for Mitigation of Constraints and Risks) implemented by the joint FAO/IAEA Division (AGE) would have a reduced publication output, in particular a technical document on understanding genetically modified organism (GMO) technology for insect pest management and attendant risks, guidelines on molecular marker methods for characterising plant genetic resources, as well as other documents.
(All amounts in US$ 000) |
|||||
Programme | RG Programme of Work | Difference | 2002-03 Zero Real Growth | Percent of Total | |
2.2.1 | Nutrition | 17,612 | (587) | 17,025 | 19% |
2.2.2 | Food and Agricultural Information | 35,958 | (1,793) | 34,165 | 39% |
2.2.3 | Food and Agricultural Monitoring, Assessments and Outlooks | 13,870 | (380) | 13,490 | 15% |
2.2.4 | Agriculture, Food Security and Trade Policy | 14,886 | (632) | 14,254 | 16% |
2.2.9 | Programme Management | 9,086 | 0 | 9,086 | 10% |
Total | 91,412 | (3,392) | 88,020 | 100% | |
(All amounts in US$ 000) |
||||
Programme Entity | RG Programme of Work | Difference | 2002-03 Zero Real Growth | |
2.2.1.A1 | Human Nutrition Requirements | 1,064 | 0 | 1,064 |
2.2.1.A2 | Nutrition Improvement for Sustainable Development | 1,790 | 0 | 1,790 |
2.2.1.A4 | Strengthening Community Action to Improve Household Food Security and Reduce Malnutrition | 1,264 | (3) | 1,261 |
2.2.1.A5 | Food and Nutrition Education, Communications and Training | 1,089 | 0 | 1,089 |
2.2.1.A6 | Nutrition and Household Food Security in Emergencies | 758 | (94) | 664 |
2.2.1.P1 | Food Composition (INFOODS) | 729 | 0 | 729 |
2.2.1.P2 | Joint FAO/WHO Food Standards Programme (Codex Alimentarius) | 4,833 | (50) | 4,783 |
2.2.1.P5 | Food Quality Control and Consumer Protection | 2,562 | (137) | 2,425 |
2.2.1.P6 | Food Safety Assessment and Rapid Alert System | 1,581 | (88) | 1,493 |
2.2.1.P7 | Public Information about Nutrition, Food Quality and Safety | 390 | 0 | 390 |
2.2.1.S1 | Technical Support Services to Member Nations and the Field Programme | 1,552 | (215) | 1,337 |
Total | 17,612 | (587) | 17,025 | |
15. Under technical project 221A6, Nutrition and Household Food Security in Emergencies, lower resource levels would imply reduced training for, and direct assistance to Members for addressing nutrition issues during emergency relief and rehabilitation. Collaboration with the working group on nutrition in emergencies of the Administrative Committee on Coordination (ACC) Sub-Committee on Nutrition would also need to be curtailed. Under entity 221P2, Joint FAO/WHO Food Standards Programme (Codex Alimentarius), it was planned to have additional four volumes of Codex Alimentarius published in all languages, which would no longer be possible. Under entity 221P5, Food Quality Control and Consumer Protection, scientific evaluation and nutritional and safety assessment of foods derived from biotechnology and the provision of advice to member countries and to the Codex Intergovernmental Task Force on Foods Derived from Biotechnology would be particularly affected. The impact on entity 221P6, Food Safety Assessment and Rapid Alert System, would be in terms of less satisfactory coverage of products and processes of topical importance. Under 221S1, Technical Support Services to Member Nations and the Field Programme, reduced volumes of activity would need to be contemplated as regards dietary assessment training workshops and food composition courses; formulation of project proposals on nutrition education and improvement in the nutritional status of populations; workshops on food control and food safety; as well as the envisaged establishment of additional National Codex Committees.
(All amounts in US$ 000) |
||||
Programme Entity | RG Programme of Work | Difference | 2002-03 Zero Real Growth | |
2.2.2.A1 | Food Insecurity and Vulnerability Information and Mapping System (FIVIMS) | 4,072 | (250) | 3,822 |
2.2.2.A2 | FAO/World Bank/USDA Initiative for Agricultural Statistics in Africa | 409 | 0 | 409 |
2.2.2.A3 | FAO Country Profiles and Mapping Information System | 438 | (100) | 338 |
2.2.2.A4 | Systematic Evaluation and Improvement of Statistical Data Quality | 916 | (878) | 38 |
2.2.2.A5 | World Agriculture Information Resource System (WAIR) | 482 | 0 | 482 |
2.2.2.P1 | Agricultural Resources and Income Statistics | 2,616 | 0 | 2,616 |
2.2.2.P2 | Agricultural Production, Trade Statistics and Food Balance Sheets | 5,149 | 0 | 5,149 |
2.2.2.P3 | Agricultural Statistics Development | 1,846 | 0 | 1,846 |
2.2.2.P5 | Programme for the Improvement of Language Coverage | 2,136 | (111) | 2,025 |
2.2.2.P6 | WAICENT Corporate Information Management and Dissemination Systems | 4,328 | (161) | 4,167 |
2.2.2.P7 | Document Repository and Electronic Publishing Systems, and Integrated Documentation Activities | 3,310 | (100) | 3,210 |
2.2.2.P8 | Facilitation of WAICENT Outreach | 1,742 | 0 | 1,742 |
2.2.2.P9 | Virtual Library Information Services | 4,427 | 0 | 4,427 |
2.2.2.S1 | Technical Support Services to Member Nations and the Field Programme | 1,552 | 0 | 1,552 |
2.2.2.S2 | Assistance to Countries in Capacity Building for Agriculture and Food Information through WAICENT | 2,535 | (193) | 2,342 |
Total | 35,958 | (1,793) | 34,165 | |
16. Under technical project 222A1, Food Insecurity and Vulnerability Information and Mapping Systems (FIVIMS), ZRG resource levels would entail elimination of the planned second edition of the State of Food Insecurity in the World (SOFI) publication within the biennium, and much reduced support to the needed start-up of FIVIMS in countries not yet covered. Technical project 222A4, Systematic Evaluation and Improvement of Statistical Data Quality, would need to be virtually eliminated, delaying the implementation of long awaited activities to improve data series. Two entities implemented by the Library and Documentation Systems Division (GIL) 222S2, Assistance to Countries in Capacity Building for Agriculture and Food Information through WAICENT, and 222P6, WAICENT Corporate Information Management and Dissemination Systems, would not benefit from the planned addition of two junior P-2 posts of Information Management Specialists, which were inter alia to support the regular Consultation on Agricultural Information Management (COAIM) organised by GIL and cross-sectoral information systems under the World Agricultural Information Centre (WAICENT). Other entities implemented by the same division i.e. 222A3, FAO Country Profiles and Mapping Information System, and 222P7, Document Repository and Electronic Publishing Systems, and Integrated Documentation Activities, or in part 222P5, Programme for the Improvement of Language Coverage, would see less work on, respectively: the development of computerised country profiles; documentation standards and semantic tools; and the further multi-language development of FAO's website and CD-ROM products.
(All amounts in US$ 000) |
||||
Programme Entity | RG Programme of Work | Difference | 2002-03 Zero Real Growth | |
2.2.3.A1 | Global Perspective Studies | 1,275 | (100) | 1,175 |
2.2.3.P2 | The State of Food and Agriculture | 1,178 | 0 | 1,178 |
2.2.3.P3 | Market Assessments for Basic Food Commodities and Impact on Global Food Security | 1,547 | (40) | 1,507 |
2.2.3.P4 | Projections and Global Commodity Analyses | 989 | 0 | 989 |
2.2.3.P5 | Market Assessments and Food Security Reports for Tropical, Horticultural and Raw Material Commodities | 2,055 | (20) | 2,035 |
2.2.3.P6 | Global Information and Early Warning System on Food and Agriculture | 6,270 | (200) | 6,070 |
2.2.3.S1 | Technical Support Services to Member Nations and the Field Programme | 556 | (20) | 536 |
Total | 13,870 | (380) | 13,490 | |
17. Under technical project 223A1, Global Perspective Studies, it would not be possible to carry out the planned expanded language coverage for the shorter and more popular version of studies in the Agriculture Towards (AT...) series. The reduction to entity 223P3, Market Assessments for Basic Food Commodities and Impact on Global Food Security, would eliminate new information products on basic foodstuffs, particularly short-term forecasts of food market prospects and price outlooks. Under 223P5, Market Assessments and Food Security Reports for Tropical, Horticultural and Raw Material Commodities, proposed additional reports on food security and export earnings for the tropical, horticultural and raw material products, short-term market monitoring notes and reviews of current policy developments would be curtailed. Entity 223P6, Global Information and Early Warning System on Food and Agriculture, would continue to suffer from a problem of chronic under-budgeting for crop and food supply assessment missions, including timely reports and alerts, which was partially remedied through the proposed real growth increase. Regional workshops for national consultants on GIEWS methodology to strengthen locally-organised assessment missions, would also be affected.
(All amounts in US$ 000) |
||||
Programme Entity | RG Programme of Work | Difference | 2002-03 Zero Real Growth | |
2.2.4.A1 | World Food Summit Monitoring and Follow-up | 542 | 0 | 542 |
2.2.4.A2 | Commodity and Trade Policy Support to Developing Countries for Trade Negotiations | 957 | (15) | 942 |
2.2.4.A3 | Mid-term Review in 2006 of Progress Towards the WFS Target | 1,012 | (355) | 657 |
2.2.4.P1 | Agricultural Adjustment and Policy Reforms | 1,639 | 0 | 1,639 |
2.2.4.P2 | Contribution of Agriculture to Poverty Alleviation, Rural Development and Food Security | 1,555 | (50) | 1,505 |
2.2.4.P3 | Economics of Natural Resources and Environmental Sustainability | 438 | 0 | 438 |
2.2.4.P4 | International Action on Commodity and Trade Issues | 5,145 | (212) | 4,933 |
2.2.4.P5 | Measures to Enhance Commodity and Trade Development | 1,307 | 0 | 1,307 |
2.2.4.S1 | Technical Support Services to Member Nations and the Field Programme | 2,291 | 0 | 2,291 |
Total | 14,886 | (632) | 14,254 | |
18. The most affected entity under this programme would be the critical Mid-term Review in 2006 of Progress Towards the WFS Target (224A3). There would only be partial country coverage for information on changes in the distribution of food consumption and the structure of agriculture, thus undermining the assessment of the impact on progress towards the World Food Summit (WFS) target. Other negatively affected activities would include: analysis of household surveys to map income distributions to the levels of caloric intake; planned report on the relationship between poverty and undernourishment, and degree of linkage between reducing poverty and reducing food insecurity; assessment of progress made in the integration of developing countries into the global trading environment; establishment of benchmarks for evaluating progress and defining future challenges; analyses of general trade policy areas as well as specific agricultural markets of high significance to developing countries. Entity 224P2, Contribution of Agriculture to Poverty Alleviation, Rural Development and Food Security, would not benefit from planned empirical studies on the economic cost of hunger, while entity 224P4, International Action on Commodity and Trade Issues, would experience much reduced capacity to deliver information on commodity and trade policy in a rapid and cost-effective manner to countries in their preferred languages, incorporating new advances in information technology and electronic dissemination to supplement traditional methods.
(All amounts in US$ 000) |
|||||
Programme | RG Programme of Work | Difference | 2002-03 Zero Real Growth | Percent of Total | |
2.3.1 | Fisheries Information | 6,991 | (529) | 6,462 | 16% |
2.3.2 | Fisheries Resources and Aquaculture | 11,091 | (823) | 10,268 | 26% |
2.3.3 | Fisheries Exploitation and Utilization | 8,477 | (279) | 8,198 | 21% |
2.3.4 | Fisheries Policy | 9,748 | (387) | 9,361 | 24% |
2.3.9 | Programme Management | 5,200 | 0 | 5,200 | 13% |
Total | 41,507 | (2,018) | 39,489 | 100% | |
(All amounts in US$ 000) |
||||
Programme Entity | RG Programme of Work | Difference | 2002-03 Zero Real Growth | |
2.3.1.A1 | Development of the Fisheries Global Information System (FIGIS) | 844 | (110) | 734 |
2.3.1.P1 | Provision of Fisheries Information and Statistics | 5,109 | (418) | 4,691 |
2.3.1.S1 | Advice and Technical Support to Member Nations and Regional Fisheries Bodies | 1,038 | (1) | 1,037 |
Total | 6,991 | (529) | 6,462 | |
19. The major effort envisaged to bring to fruition the Fisheries Global Information System (FIGIS) and parallel improvement in the collection and dissemination of fisheries statistics, would be undermined by the deletion of two proposed new posts of Departmental Technical Editor and Fisheries Statistician for the Asia and Pacific region, which could not be established under ZRG resource levels.
(All amounts in US$ 000) |
||||
Programme Entity | RG Programme of Work | Difference | 2002-03 Zero Real Growth | |
2.3.2.A1 | Promotion of Responsible Inland Fisheries and Aquaculture | 1,839 | (95) | 1,744 |
2.3.2.A2 | Increased Contribution of Aquaculture and Inland Fisheries to Food Security | 842 | (33) | 809 |
2.3.2.A3 | Marine Fisheries Resources Identification and Biodata | 1,163 | (152) | 1,011 |
2.3.2.A4 | Monitoring and Reporting on Global Marine Resources and Relevant Environmental and Ecological Changes | 1,078 | (4) | 1,074 |
2.3.2.A5 | Assessment and Management of Fisheries Resources | 1,165 | (144) | 1,021 |
2.3.2.P1 | Global Monitoring and Strategic Analysis of Inland Fisheries and Aquaculture | 2,177 | (221) | 1,956 |
2.3.2.S1 | Advice on Marine Resources and Environmental Issues and Aquaculture Development | 2,827 | (174) | 2,653 |
Total | 11,091 | (823) | 10,268 | |
20. This programme would not benefit from the expected important technical contributions of two proposed new specialist posts dealing with marine ecosystem management and aquaculture (in the Latin America and Caribbean region) and attendant non-staff resources. Accordingly, entity 232S1 covering advisory services to countries would need to be reduced, as well as outputs under other entities where ecosystem management issues are critical. A minimal provision to support the new Sub-committee on Aquaculture endorsed by COFI at its March 2001 session, would not be included (under 232P1, Global Monitoring and Strategic Analysis of Inland Fisheries and Aquaculture), leaving its operation basically dependent on extra-budgetary resources.
(All amounts in US$ 000) |
||||
Programme Entity | RG Programme of Work | Difference | 2002-03 Zero Real Growth | |
2.3.3.A1 | Reduction of Discards and Environmental Impact from Fisheries | 1,072 | (89) | 983 |
2.3.3.A2 | Sustainable Development of Small-scale Fisheries | 1,355 | (4) | 1,351 |
2.3.3.A3 | Increased Production from Under-utilised Aquatic Resources and Low-value Catches | 571 | (1) | 570 |
2.3.3.A4 | Consumption, Safety and Quality of Fish Products | 1,288 | (109) | 1,179 |
2.3.3.A5 | Promotion of International Fish Trade | 1,224 | (6) | 1,218 |
2.3.3.S1 | Support and Advice in Fishing Technology, Fish Utilisation and Trade | 2,967 | (70) | 2,897 |
Total | 8,477 | (279) | 8,198 | |
21. This programme would be much less affected than the preceding two. However, planned work on the development of seafood-related information systems, particularly on food safety and processing technology, would need to be reduced (project 233A4, Consumption, Safety and Quality of Fish Products), as well as work on the environmental impact of fishing operations (project 233A1, Reduction of Discards and Environmental Impact from Fisheries).
(All amounts in US$ 000) |
||||
Programme Entity | RG Programme of Work | Difference | 2002-03 Zero Real Growth | |
2.3.4.A1 | Coordination and Monitoring of the Implementation of the Code of Conduct for Responsible Fisheries | 1,070 | (2) | 1,068 |
2.3.4.A4 | Promotion of Coastal Fisheries Management | 1,002 | (1) | 1,001 |
2.3.4.A5 | Promotion of Appropriate National/Regional Policies for Sustainable Aquaculture Development | 659 | (1) | 658 |
2.3.4.P2 | Global Analysis of Economic and Social Trends in Fisheries and Aquaculture | 1,224 | (4) | 1,220 |
2.3.4.P3 | Economic and Social Analysis of Fishery and Aquaculture Policy and Management | 1,662 | (308) | 1,354 |
2.3.4.S1 | Promotion and Strengthening of Regional Fisheries Bodies and Arrangements and Field Programme Support | 4,131 | (71) | 4,060 |
Total | 9,748 | (387) | 9,361 | |
22. The impact of lower resource availability under ZRG would be felt principally in terms of much reduced support to the International Plans of Action endorsed by COFI under entity 234P3, Economic and Social Analysis of Fishery and Aquaculture Policy and Management, and associated services under entity 234S1, Promotion and Strengthening of Regional Fisheries Bodies and Arrangements and Field Programme Support.
(All amounts in US$ 000) |
|||||
Programme | RG Programme of Work | Difference | 2002-03 Zero Real Growth | Percent of Total | |
2.4.1 | Forest Resources | 8,434 | (873) | 7,561 | 25% |
2.4.2 | Forest Products | 6,205 | (56) | 6,149 | 20% |
2.4.3 | Forestry Policy and Planning | 8,208 | (755) | 7,453 | 25% |
2.4.4 | Forest Programmes Coordination and Information | 4,385 | (198) | 4,187 | 14% |
2.4.9 | Programme Management | 5,038 | 0 | 5,038 | 17% |
Total | 32,270 | (1,882) | 30,388 | 100% | |
(All amounts in US$ 000) |
||||
Programme Entity | RG Programme of Work | Difference | 2002-03 Zero Real Growth | |
2.4.1.A1 | Sustainable Management of Natural Forests and Woodlands | 1,921 | (76) | 1,845 |
2.4.1.A2 | Trees Outside Forests | 0 | 0 | 0 |
2.4.1.A3 | Sustainable Mountain Development and Watershed Management | 0 | 0 | 0 |
2.4.1.A4 | Environmental Conservation in Forests and Fragile Ecosystems | 1,769 | (451) | 1,318 |
2.4.1.A5 | Forest Plantations and Trees Outside Forests | 969 | (26) | 943 |
2.4.1.P1 | Assessment and Monitoring of Forests and Woodland Resources | 1,592 | (96) | 1,496 |
2.4.1.S1 | Technical Support and Advisory Services | 2,183 | (224) | 1,959 |
Total | 8,434 | (873) | 7,561 | |
23. The above indicated ZRG provisions would entail the need to abandon the proposed establishment of one new post of P-4 Forestry Officer (Sustainable Mountain Development) at Headquarters and one new post of P-3 Forestry Officer (Wildlife Management) in the Regional Office for Africa, hence the much reduced levels under entity 241A4, Environmental Conservation in Forests and Fragile Ecosystems, and also to the support services under 241S1. This would negatively impact on FAO's capacity to provide services in the two key areas of mountain development (in follow-up to the International Year of Mountains for which FAO is the designated lead agency for the UN system) and wildlife. The implementation of a coordinated international system in response to forest fires under project 241A1, Sustainable Management of Natural Forests and Woodlands, would also be affected, together with support to capacity building on forest surveys and monitoring under entity 241P1, Assessment and Monitoring of Forests and Woodland Resources.
(All amounts in US$ 000) |
||||
Programme Entity | RG Programme of Work | Difference | 2002-03 Zero Real Growth | |
2.4.2.A1 | Environmental Aspects of Forests | 880 | (11) | 869 |
2.4.2.A2 | Increasing Productivity in Sustainable Forest Raw Material Utilization | 0 | 0 | 0 |
2.4.2.P1 | Forest Products Information | 2,016 | (18) | 1,998 |
2.4.2.P2 | Appropriate Utilisation of Forest Products | 1,843 | (25) | 1,818 |
2.4.2.P3 | Forest Products Utilization Issues | 0 | 0 | 0 |
2.4.2.S1 | Support to Field Projects and Advisory Services | 1,466 | (2) | 1,464 |
Total | 6,205 | (56) | 6,149 | |
24. Only marginal adjustments would prove necessary for most activities under this programme.
(All amounts in US$ 000) |
||||
Programme Entity | RG Programme of Work | Difference | 2002-03 Zero Real Growth | |
2.4.3.A1 | Forestry Sector Outlook Studies | 1,769 | (124) | 1,645 |
2.4.3.A2 | Forests, Trees and People Programme | 0 | 0 | 0 |
2.4.3.A3 | Strengthening of Institutional Capacities at Country Level | 1,832 | (438) | 1,394 |
2.4.3.P1 | Formulation of National Forest Programmes | 1,216 | (82) | 1,134 |
2.4.3.P2 | Analysis of Economic Factors in Forestry | 799 | (6) | 793 |
2.4.3.P3 | Forest Products Production and Trade Statistics | 0 | 0 | 0 |
2.4.3.P4 | Participatory Forestry | 827 | (17) | 810 |
2.4.3.P5 | State of World's Forests | 0 | 0 | 0 |
2.4.3.S1 | Interaction with Field Programmes and Advisory Services | 1,765 | (88) | 1,677 |
Total | 8,208 | (755) | 7,453 | |
25. Progress on the Latin American and Caribbean Forest Outlook Study would be in all likelihood slowed down by the curtailment of project 243A1, Forestry Sector Outlook Studies. However, the most critically affected entity would be project 243A3, Strengthening of Institutional Capacities at Country Level, as ZNG would imply the deferment of a new P-4 post supporting the implementation of National Forest Programmes (also impacting on services provided under entities 243P1, Formulation of National Forest Programmes, and 243S1, Interaction with Field Programmes and Advisory Services). A necessary substantial reduction of non-staff resources under the same entity 243A3, Strengthening of Institutional Capacities at Country Level, could hamper the functioning of the planned National Forest Programme Implementation Facility.
(All amounts in US$ 000) |
||||
Programme Entity | RG Programme of Work | Difference | 2002-03 Zero Real Growth | |
2.4.4.A1 | Follow up to UNCED and International Forestry Processes | 412 | 0 | 412 |
2.4.4.P1 | Forestry Information | 2,201 | (187) | 2,014 |
2.4.4.S1 | Support to Statutory Bodies and Liaison with the Regional Offices | 1,772 | (11) | 1,761 |
Total | 4,385 | (198) | 4,187 | |
26. The reduced allocation under entity 244P1, Forestry Information, would constrain the intent to increase language coverage for key technical publications and in the forestry section of FAO's website.
(All amounts in US$ 000) |
|||||
Programme | RG Programme of Work | Difference | 2002-03 Zero Real Growth | Percent of Total | |
2.5.1 | Research, Natural Resources Management and Technology Transfer | 21,655 | (988) | 20,667 | 40% |
2.5.2 | Gender and Population | 6,317 | (793) | 5,524 | 11% |
2.5.3 | Rural Development | 8,710 | (515) | 8,195 | 16% |
2.5.6 | Food Production in Support of Food Security in LIFDCs | 10,861 | (574) | 10,287 | 20% |
2.5.9 | Programme Management | 7,241 | 0 | 7,241 | 14% |
Total | 54,784 | (2,870) | 51,914 | 100% | |
(All amounts in US$ 000) |
||||
Programme Entity | RG Programme of Work | Difference | 2002-03 Zero Real Growth | |
2.5.1.A1 | Integrated Use of Information for Sustainable Development | 2,786 | (393) | 2,393 |
2.5.1.A2 | Youth in Agriculture, Food Security and Sustainable Livelihoods | 834 | (1) | 833 |
2.5.1.A3 | Partnerships for Improving Application of Biotechnology in Agriculture | 1,006 | (80) | 926 |
2.5.1.A4 | Integrated Development and Dissemination of Agricultural Knowledge and Technology for Food Security and Sustainable Development | 3,510 | (142) | 3,368 |
2.5.1.A5 | Global Forum on Agricultural Research (GFAR) Secretariat | 201 | (100) | 101 |
2.5.1.A6 | Support to Environmental Agreements and Promotion of Integrated Environmental Planning and Management | 1,579 | 0 | 1,579 |
2.5.1.P1 | Environmental Geo-Information Infrastructure and Services | 1,729 | 0 | 1,729 |
2.5.1.P3 | Information and Communication Technologies in Support of Agricultural Research, Extension and Education Systems | 2,101 | (272) | 1,829 |
2.5.1.P4 | Secretariat of the Technical Advisory Committee (TAC) of the CGIAR | 4,262 | 0 | 4,262 |
2.5.1.S1 | Technical Support Services to Member Nations, the Field Programme, and Other Related Activities | 3,647 | 0 | 3,647 |
Total | 21,655 | (988) | 20,667 | |
27. The substantially reduced provision under technical project 251A1, Integrated Use of Information for Sustainable Development, would affect support to networks to improve the use of geo-referenced information in relation to key international conventions, as well as capacity building in countries to implement environmental agreements. The same would apply to entity 251P3, Information and Communication Technologies in Support of Agricultural Research, Extension and Education Systems, in terms of facilitation of access to new information and communication technologies by rural communities at levels originally envisaged. It would also be necessary to reduce by half the FAO contribution to the Global Forum on Agricultural Research (GFAR) Secretariat (251A5).
(All amounts in US$ 000) |
||||
Programme Entity | RG Programme of Work | Difference | 2002-03 Zero Real Growth | |
2.5.2.A2 | Inter-relations between Gender, Population and Food Security | 1,391 | (420) | 971 |
2.5.2.A3 | Gender and Natural Resources Management | 1,000 | (3) | 997 |
2.5.2.P1 | Promotion of Gender and Population in Policies, Legislation and Civil Institutions | 2,777 | (351) | 2,426 |
2.5.2.S1 | Technical Support to Member Nations and the Field Programme | 1,149 | (19) | 1,130 |
Total | 6,317 | (793) | 5,524 | |
28. Under ZRG, it would be necessary to forego the establishment of the proposed new post dealing with the impact of the HIV/AIDS epidemic on food security, and associated planned activities on this important issue covered under project 252A2. Lower available resources under entity 252P1, Promotion of Gender and Population in Policies, Legislation and Civil Institutions, would affect planned Socio-economic Analysis and Gender Analysis Programme (SEAGA) workshops and detract from planned support to the implementation of the FAO Gender and Development Plan of Action (2002-2007) once approved by the FAO Conference.
(All amounts in US$ 000) |
||||
Programme Entity | RG Programme of Work | Difference | 2002-03 Zero Real Growth | |
2.5.3.A1 | Access 21: Land Tenure Institution Building for Food Security and Sustainable Rural Development | 1,634 | (12) | 1,622 |
2.5.3.A2 | Improved Rural Institutions and Services to Promote Sustainable Rural Livelihoods | 1,767 | (238) | 1,529 |
2.5.3.A4 | Participatory Approaches and Methods to Support Sustainable Livelihoods and Food Security | 1,161 | (3) | 1,158 |
2.5.3.P1 | Management and Support to the ACC Network on Rural Development and Food Security | 980 | (165) | 815 |
2.5.3.S1 | Technical Support Services on Participatory Approaches, Institutional Development and Access to Land Resources | 3,168 | (97) | 3,071 |
Total | 8,710 | (515) | 8,195 | |
29. Under project 253A2, Improved Rural Institutions and Services to Promote Sustainable Rural Livelihoods, it would be necessary to reduce a number of planned case studies and inter-regional consultations, as well as training activities on institutional reforms, including the new roles of farmers and community organizations. Similarly, under entity 253P1, Management and Support to the ACC Network on Rural Development and Food Security, several activities would be negatively affected, including: prototype network systems for the national thematic groups affiliated to the broad-based ACC network; seminars for capacity building of these thematic groups and advisory missions particularly in the Horn of Africa sub-region.
(All amounts in US$ 000) |
||||
Programme Entity | RG Programme of Work | Difference | 2002-03 Zero Real Growth | |
2.5.6.P1 | Coordination and Monitoring | 1,299 | 0 | 1,299 |
2.5.6.P2 | SPFS Formulation | 1,328 | 0 | 1,328 |
2.5.6.P3 | SPFS Implementation | 8,234 | (574) | 7,660 |
Total | 10,861 | (574) | 10,287 | |
30. The elimination of the net increase under 256P3, SPFS Implementation, would be to the detriment of the further expansion of the Special Programme for Food Security (SPFS).
(All amounts in US$ 000) |
|||||
Major Programme | RG Programme of Work | Difference | 2002-03 Zero Real Growth | Percent of Total | |
3.1 | Policy Assistance | 28,273 | (847) | 27,426 | 15% |
3.2 | Support to Investment | 45,731 | 0 | 45,731 | 26% |
3.3 | Field Operations | 20,979 | (800) | 20,179 | 11% |
3.4 | FAO Representatives | 77,653 | (4,250) | 73,403 | 41% |
3.5 | Cooperation with External Partners | 9,578 | 0 | 9,578 | 5% |
3.9 | Programme Management | 2,028 | 0 | 2,028 | 1% |
Total | 184,242 | (5,897) | 178,345 | 100% | |
(All amounts in US$ 000) |
|||||
Programme | RG Programme of Work | Difference | 2002-03 Zero Real Growth | Percent of Total | |
3.1.1 | Coordination of Policy Assistance and Related Capacity Building | 5,220 | (117) | 5,103 | 19% |
3.1.2 | Policy Assistance to Various Regions | 15,756 | (630) | 15,126 | 55% |
3.1.3 | Legal Assistance to Member Nations | 3,199 | (100) | 3,099 | 11% |
3.1.9 | Programme Management | 4,098 | 0 | 4,098 | 15% |
Total | 28,273 | (847) | 27,426 | 100% | |
(All amounts in US$ 000) |
||||
Programme Entity | RG Programme of Work | Difference | 2002-03 Zero Real Growth | |
3.1.1.A1 | Development of On-line Training Capacity in Food, Agriculture and Rural Development Policy and Planning | 346 | 0 | 346 |
3.1.1.P1 | Coordination of and Support to Policy Assistance and Advice | 1,060 | 0 | 1,060 |
3.1.1.P2 | Coordination of Field Programme Development Activities | 939 | 0 | 939 |
3.1.1.P3 | Development of Training Materials and Methods in Food and Agriculture Policy Analysis | 812 | 0 | 812 |
3.1.1.P4 | Coordination of Country Focus | 515 | (17) | 498 |
3.1.1.S2 | Technical Support to Capacity Building in Food, Agriculture and Rural Development Planning and Policy Analysis | 1,548 | (100) | 1,448 |
Total | 5,220 | (117) | 5,103 | |
31. While still being strengthened even at ZRG, entity 311S2, Technical Support to Capacity Building in Food, Agriculture and Rural Development Planning and Policy Analysis, would not be able to sustain, as fully as desirable, the range of demands for capacity building in food and agricultural planning and policy analysis.
(All amounts in US$ 000) |
||||
Programme Entity | RG Programme of Work | Difference | 2002-03 Zero Real Growth | |
3.1.2.P1 | Enhancement of Country Focus | 2,353 | (60) | 2,293 |
3.1.2.P2 | Field Programme Development | 4,414 | (300) | 4,114 |
3.1.2.P3 | Advice, Support and Training in Agricultural Policies | 6,047 | (270) | 5,777 |
3.1.2.S1 | Advice in Sector Policy | 0 | 0 | 0 |
3.1.2.S3 | Technical Support to Field Programmes | 2,942 | 0 | 2,942 |
Total | 15,756 | (630) | 15,126 | |
32. As mentioned in paragraph 462 of the SPWB document, the bulk of the net increase in resources under Major Programme 3.1 was precisely to strengthen key supportive activities of the decentralized policy assistance branches and units. Its virtual elimination under ZRG would hamper its capacity to contribute to a reinvigorated field programme.
(All amounts in US$ 000) |
||||
Programme Entity | RG Programme of Work | Difference | 2002-03 Zero Real Growth | |
3.1.3.A1 | Support to the Development of a Regulatory Framework for Food and Agriculture | 310 | (30) | 280 |
3.1.3.P1 | Collection and Dissemination of Legal Information | 1,130 | 0 | 1,130 |
3.1.3.S1 | Provision of Technical Advice | 1,759 | (70) | 1,689 |
Total | 3,199 | (100) | 3,099 | |
33. Similarly, the elimination of the net increase from the provision (admittedly not substantial in absolute terms, but still important given the small resource base of a programme well appreciated by the membership) would reduce the capacity of the Legal Office to meet pressing demands for assistance.
(All amounts in US$ 000) |
|||||
Programme | RG Programme of Work | Difference | 2002-03 Zero Real Growth | Percent of Total | |
3.3.1 | Field Operations in Various Regions | 7,637 | 0 | 7,637 | 38% |
3.3.2 | Central Support and Special Activities | 5,282 | (800) | 4,482 | 22% |
3.3.3 | Emergency Response Operations | 7,277 | 0 | 7,277 | 36% |
3.3.9 | Programme Management | 783 | 0 | 783 | 4% |
Total | 20,979 | (800) | 20,179 | 100% | |
34. The curtailment of the provision made under the real growth proposal to support the full-scale implementation of the Field Programme Management Information System (FPMIS) would critically affect a potentially essential tool in the development and management of the field programme4.
(All amounts in US$ 000) |
|||||
Programme | RG Programme of Work | Difference | 2002-03 Zero Real Growth | Percent of Total | |
3.4.0 | FAO Representatives | 77,653 | (4,250) | 73,403 | 100% |
Total | 77,653 | (4,250) | 73,403 | 100% | |
35. The resource level indicated in the above table under ZRG would obviously negate the benefits expected from the more substantial increase factored in the real growth proposal. As stated in paragraph 511 of the SPWB, this was essentially for two purposes: a) augmenting FAO's contribution to the functioning of the eleven new country representations, based on the outposted technical officer arrangement introduced in 2001, beyond the cost of the latter officers; and b) strengthening the human resource capacities of FAO representations, through additional staff to fill critical gaps and the extensive training required by ever-increasing responsibilities, and for the necessary substantial upgrades of telecommunications and computer equipment for their efficient functioning. It would, however, still allow for the addition of US$ 1.6 million from administrative and operational support services (AOS) resources to compensate the current network of country offices for increased workload due to decentralization measures taken in the 2000-2001 biennium.
(All amounts in US$ 000) |
|||||
Major Programme | RG Programme of Work | Difference | 2002-03 Zero Real Growth | Percent of Total | |
4.1 | Technical Cooperation Programme | 98,906 | (10,250) | 88,656 | 97% |
4.2 | TCP Unit | 2,813 | 0 | 2,813 | 3% |
Total | 101,719 | (10,250) | 91,469 | 100% | |
36. Again, the elimination of the substantial increase in resources contemplated under the real growth proposal would negate the expected benefits. This would reduce TCP's share of the total budget appropriation from the called for 14.9% back to the current level of 14.1%. It may be noted that the strengthening of the TCP Unit (Major Programme 4.2) has been maintained as it is critical to the good performance of the entire programme, entailing an even lower provision available for projects than that included in the current PWB.
(All amounts in US$ 000) |
|||||
Major Programme | RG Programme of Work | Difference | 2002-03 Zero Real Growth | Percent of Total | |
5.1 | Information and Publications Support | 17,240 | (827) | 16,413 | 26% |
5.2 | Administration | 49,543 | (3,376) | 46,167 | 74% |
Total | 66,783 | (4,203) | 62,580 | 100% | |
(All amounts in US$ 000) |
|||||
Programme | RG Programme of Work | Difference | 2002-03 Zero Real Growth | Percent of Total | |
5.1.1 | Public Information and Publications Support | 16,055 | (814) | 15,241 | 93% |
5.1.9 | Programme Management | 1,185 | (13) | 1,172 | 7% |
Total | 17,240 | (827) | 16,413 | 100% | |
37. This programme has been severely cut in recent budgets despite the cross-organizational strategy on Communicating FAO's messages. The additional allocation under real growth is aimed at redressing the situation. Without additional resources, the Information Division (GII) would not be able to carry out highly desirable qualitative improvements to its information and publication support activities. While the new post of Arabic Editor can still be covered under the above allocation, the new post of Exhibition Curator (to make full use of the Atrium at Headquarters) would not be accommodated, as well as the intended strengthening of media outreach in decentralized offices.
(All amounts in US$ 000) |
|||||
Programme | RG Programme of Work | Difference | 2002-03 Zero Real Growth | Percent of Total | |
5.2.1 | Financial Services | 22,600 | (1,688) | 20,912 | 45% |
5.2.2 | Information Systems and Technology Services | 1,757 | 0 | 1,757 | 4% |
5.2.3 | Human Resources Services | 19,570 | (1,688) | 17,882 | 39% |
5.2.9 | Programme Management | 5,616 | 0 | 5,616 | 12% |
Total | 49,543 | (3,376) | 46,167 | 100% | |
38. The reduced provision under ZRG would virtually cripple the Organization's ability to meet, at least in part as envisaged under the real growth proposal, the development costs of subsequent phases of the Oracle project from the normal source which the Regular Programme Appropriation should represent. This would leave this project basically dependent on funding opportunities from arrears, which are not yet entirely certain. Alternatively, it would imply postponement of Phase II of the project until such time as adequate resources can be released.