UNDP/FAO Regional Project for Inland Fisheries Planning | RAF/87/099-TD/21/91 (En) |
Development and Management in Eastern/Central/Southern Africa |
RAF/87/099-TD/21/91 (En) | June 1991 |
Report of the Second Technical Consultation on the Management of the Fisheries of lakes Edward and Mobutu Kinshasa, 27–29 May 1991 (Zaire) |
The conclusions and recommendations given in this and other reports in the IFIP project series are those considered appropriate at the time of preparation. They may be modified in the light of further knowledge gained at subsequent stages of the Project. The designations employed and the presentation of material in this publication do not imply the expression of any opinion on the part of FAO or UNDP concerning the legal status of any country, territory, city or area, or concerning the determination of its frontiers or boundaries.
PREFACE
The IFIP project started in January 1989 with the main objective of promoting a more effective and rational exploitation of the fisheries resources of major water bodies of Eastern, Central and Southern Africa. The project is executed by the Food and Agriculture Organisation of the United Nations (FAO), and funded by the United Nations Development Programme (UNDP) for a duration of four years.
There are eleven countries and three intergovernmental organisations participating in the project: Burundi, Ethiopia, Kenya, Malawi, Mozambique, Uganda, Rwanda, Tanzania, Zambia, Zaire, Zimbabwe, The Communauté Economique des Pays des Grands Lacs (CEPGL), The Preferential Trade Area for Eastern and Southern African States (PTA) and the Southern African Development Coordination Conference (SADCC).
The immediate objectives of the project are: (i) to strengthen regional collaboration for the rational development and management of inland fisheries, particularly with respect to shared water bodies; (ii) to provide advisory services and assist Governments in sectoral and project planning; (iii) to strengthen technical capabilities through training; and (iv) to establish a regional information base.
The present document is the report of a Second Technical Consultation on lakes Edward and Mobutu Sese Seko organised by the Regional Project for Inland Fisheries Planning (IFIP) from 27 to 29 May 1991 at Kinshasa, Zaire. This report also contains a Protocol Agreement between the Republic of Uganda and the Republic of Zaire concerning the creation of a Special Joint Commission on Fisheries and a project document for the management and development of fisheries in Lake Edward and Lake Mobutu.
This document is published in French and English
IFIP PROJECT
FAO
B.P. 1250
BUJUMBURA
BURUNDI
Telex : FOODAGRI BDI 5092 | Fax 227705 | Tel. 22/4328 |
IFIP PUBLICATIONS
Publications of the IFIP project are issued in two series:
A series of technical documents (RAF/87/099-TD) related to meetings, missions and research organized by the project.
A series of working papers (RAF/87/099-WP) related to more specific field and thematic investigations conducted in the framework of the project.
For both series, reference is further made to the document number (21), the year of publication (91) and the language in which the document is issued: English (En) or French (Fr).
For bibliographic purposes this document should be cited as follows:
Report of the Second Technical Consultation on the Management of the Fisheries of lakes Edward and Mobutu, 27–29 May 1991, Kinshasa, Zaire. 1991 UNDP/FAO Regional Project for Inland Fisheries Planning (IFIP), RAF/87/099-TD/21/91 (En): 28p.
FOOD AND AGRICULTURE ORGANIZATION OF THE UNITED NATIONS
UNITED NATIONS DEVELOPMENT PROGRAMME
Bujumbura, June 1991
Hyperlinks to non-FAO Internet sites do not imply any official endorsement of or responsibility for the opinions, ideas, data or products presented at these locations, or guarantee the validity of the information provided. The sole purpose of links to non-FAO sites is to indicate further information available on related topics.
This electronic document has been scanned using optical character recognition (OCR) software. FAO declines all responsibility for any discrepancies that may exist between the present document and its original printed version.
1. The second Technical Consultation on the management of the fisheries of lakes Edward and Mobutu Sese Seko was held in Kinshasa, Zaire, from 27 to 29 of May 1991. A delegation from Zaire and a delegation from Uganda as well as observes participated at this Technical Consultation. The list of participants is given in annex 1.
2. The Secretary General of the Ministry of Environment and Conservation of Nature, Mr Lumande Kasali opened the meeting in the name of the Minister of Environment and Conservation of Nature. He emphasized the importance of regional collaboration in the management of shared fisheries resources, and expressed his appreciation of the work and achievements of the first Technical Consultation.
3. The Chairman of the first Technical Consultation, Mr. E.S. Kanyike, Commissioner for Fisheries of Uganda, emphasized the importance of these consultations in strengthening regional collaboration for the joint management of these shared fisheries resources.
4. The Director of the National Service for the Promotion and Development of Fisheries in Zaire, Mr. Sabuni Kasereka and Mr. E.S. Kanyike, Commissioner for Fisheries in Uganda, were respectively elected Chairman and Vice Chairman. The agenda given in annex 2 was adopted by the Technical Consultation.
5. The Chairman of the Technical Consultation presented an overview of the priorities, conclusions and recommendations adopted by the first Technical Consultation held in Kampala, Uganda, from 17 to 21 September 1990. It was stressed that based on the deliberations of the three working groups on statistics, research and management, the participants have identified priorities and requirements for technical and financial support in these areas. The creation of a Special Joint Commission on Fisheries was also considered as an essential requirement for effective regional collaboration.
6. The priorities and related need for technical and financial assistance were identified as follows:
Institutional strengthening for the management of Lake Edward;
The implementation of stock assessment and related research for Lake Mobutu;
The improvement of fishing and fish processing techniques and related infrastructure;
The training of researchers and fisheries staff including extension personnel.
7. The Technical Consultation examined a draft Protocal of Agreement between the Republic of Uganda and the Republic of Zaire concerning the creation of a Special Joint Commission on Fisheries.
8. The Technical Consultation noted that the terminology used for the names of the two lakes was different in both countries. As a result, the terminology used in the Protocol of Agreement should be considered provisional, awaiting a decision on standardisation by the relevant authorities of both countries.
9. The draft Protocol of Agreement was amended after a thorough examination of the articles as presented in annex 3. The draft Protocol of Agreement was then adopted by the Technical Consultation. The two delegations further agreed to submit the adopted draft Protocol of Agreement to their relevant authorities for ratification.
10. The Chairman presented the draft project proposal prepared by the IFIP Project. He reminded the participants that this project has been prepared in collaboration with the fisheries authorities of both countries on the basis of the priorities and recommendations expressed by the first Technical Consultation. The project proposal was discussed at length and revised accordingly. The revised project proposal is presented in annex 4.
11. The Technical Consultation stressed the importance of this project for the sound management of these resources as a way to ensure an increased and sustained supply of fisheries products to the population as well as a secure source of employment and revenue to the fisherfolks concerned.
12. The Chairman reminded the Technical Consultation that EEC was financing related projects in the area and that it had expressed a strong interest for this project during the first Consultation. The Technical Consultation underlined that this project could be implemented on a regional basis or as two closely coordinated national projects.
13. The Technical Consultation noted that the revised project proposal remained of an indicative nature and that further field work and consultation were required to finalise the preparation of the project document by a donor mission.
14. The Technical Consultation recommended that the two delegations submit this project proposal to the EEC delegation in their respective countries for consideration and for their eventual support to the financing of the aforementioned mission.
15. The mission should further assess the priorities and the need for assistance in achieving the three immediate objectives stipulated in the project proposal and finalise a project document on this basis. The Technical Consultation estimated that a joint mission of 2 or 3 months by a team composed of a fisheries biologist and a fisheries development specialist was required.
16. The Technical Consultation expressed its satisfaction with the support provided by the IFIP Project and recommended that further assistance be provided to facilitate increased cooperation between the two countries.
17. The Technical Consultation requested in particular immediate assistance on the part of IFIP in addressing urgent issues pertaining to the management of Lake Edward. This would entail an assessment of management measures related to the control of fishing effort and fishing practices and making specific proposals to both countries for the harmonization and effective implementation of these measures.
18. This report was adopted on the 29th May 1991.
19. The Technical Consultation recommended that the next meeting be held in Kampala during the period March-May 1992.
Annex 1
List of participants
Zaire Delegation | |||
1. | Sabuni Kasereka | : | Director, SENADEP |
2. | Kalibu Mino Kahozi | : | Technical Coordinator, SENADEP |
3. | Kabuyaya Mbeva | : | Legal Advisor, ECN |
4. | Mantekila Lutetesh Sh. | : | Divisional Head, Ministry of Planning and Territorial Management |
5. | Nkutu Labund | : | Ministry of Planning and Territorial Management |
6. | Makanda Nsonsa | : | Officer-in-Charge, Ministry of International Cooperation |
7. | Ngyese Nsamba | : | Advisor, Ministry of International Cooperation |
Uganda Delegation | |||
8. | E.S. Kanyike | : | Commissioner for Fisheries (UGANDA) |
9. | Milton Ayen | : | Fisheries Officer (UGANDA) |
10. | Ben Turyasingura | : | Jurist, Ministry of Justice (UGANDA) |
Observers | |||
11. | Matindo-ma-Nzewa | : | Bursar, SENADEP |
12. | Mvika Ngonda | : | Secretary, SENADEP |
13. | Bonga Di Nzau | : | Chief, Ministry of Foreign Affairs, Kinshasa |
14. | Lumande Kasali | : | Works Supervisor |
15. | A. Konare | : | CTP ZAI/88/002 |
Secretariat | |||
1. | D. Gréboval | : | Coordinator, IFIP Project |
2. | M. Maes | : | APO Biologist, IFIP Project |
3. | Ben Turyasingura | : | Jurist, Ministry of Justice (UGANDA) |
4. | Ngyese Nsamba | : | Advisor, Ministry of International Cooperation |
Annex 2
Agenda
Adoption of the Agenda
Appointment of the Chairman
Appointment of Vice-Chairman
Communication from the Chairman
Draft Protocol Agreement
Development Project
Any other matter
Adoption of the Report
Date and place of the next meeting
Annex 3
PROTOCOL OF AGREEMENT BETWEEN THE REPUBLIC OF UGANDA AND THE REPUBLIC OF ZAIRE CONCERNING THE CREATION OF A SPECIAL JOINT COMMISSION ON FISHERIES
The government of the Republic of Zaire and
The government of the republic of Uganda;
Wishing to establish a basis for the development and sound management of the fisheries of lakes Edward (*) and Mobutu Sese Seko (*)1 in the interest of their peoples;
Recognizing that common stocks and the technical, economic and social characteristics of the fisheries of lakes Edward and Mobutu Sese Seko call for close co-operation between the States sharing these waters;
Convinced that such objectives require the establishment of an appropriate institutional framework allowing the adoption of common and concerted solutions as regards research, and the exploitation, conservation and management of shared fisheries resources;
Considering the conclusions of the first technical consultation between the Republic of Uganda and the Republic of Zaire on the management of lakes Edward and Mobutu Sese Seko held in Kampala from September 17 to 21, 1990;
In conformity with recommendations of the fourth session of the Zairian-Ugandan Joint Commission held in Kinshasa from April 4 to 6, 1990;
Agree on the following:
Article 1
Application
The present protocol as well as all the measures taken in accordance with its provisions shall apply to the waters of lakes Edward and Mobutu Sese Seko and their shores.
Article 2
Commission
The Republic of Uganda and the Republic of Zaire, hereafter referred to as the Contracting Parties, initiate a Special Joint Commission on Fisheries hereafter referred to as the Commission.
Article 3
Mandate
The Commission's function shall be to carry out the objectives of the present Protocol and in particular:
To elaborate, implement and follow up a fisheries management plan based on a common policy as regards the management and development of the fisheries of the two lakes, and with as main objective the rational exploitation of these resources;
To elaborate and submit to the Contracting parties common development plans aiming at increased sustainable production, the improvement of fish products and infrastructures, and the organization of fish trade between the two States in order to improve the livelihood of fisherfolk communities;
To define and follow up strategies and common action programmes for fisheries research so as to provide basic scientific data needed to elaborate the above-mentioned plans and to define common regulations;
To elaborate, implement and follow up common policies and measures in order to harmonize between the Contracting Parties provisions concerning fishing practices;
To define and follow-up strategies and common action programmes as regards data collection for improved monitoring of stocks and better management;
To propose to the Contracting Parties, strategies and common action programmes for training at the fisherfolk community level, as well as for fisheries staff;
To study with donors and for the attention of the Contracting Parties, possible financing arrangements for the plans and programmes so adopted.
Article 4
Composition of Delegation
1. Each of the Contracting Parties shall designate members of its delegation up to a maximum of four (4) including the Director of Fisheries of each Contracting Party. The Directors of Fisheries shall attend and chair on a rotating basis.
2. Each delegation may also appoint experts of its choice.
Article 5
Local authorities
Considering the localisation of the fisheries and the administrative organizations of each Contracting Party, the Commission shall accordingly associate local authorities concerned in its work as judged appropriate.
Article 6
Working groups
The Commission may designate working groups whose function shall be to study one or more of the points mentioned in Article 3 as well as every question relevant to the objectives defined by the present Protocol.
Article 7
Internal governing guidelines
The Commission shall stipulate its internal rules or adopt those of the Zairian-Ugandan Joint Commission if judged appropriate.
Article 8
Financing
Expenses relating to the participation of delegations and experts in the Commission's work shall be at the charge of each of the Contracting Parties.
Article 9
Meetings
The Commission shall meet at least once a year alternately on the territory of one of the Contracting Parties. It may, moreover, meet at the request of one of the Contracting Parties within a period of 3 months.
Article 10
Amendments
1. Each Contracting Party may request, in writing and at any moment, a modification of the terms of the present Protocol.
2. An amendment of the terms of the present Protocol shall come into force as soon as accepted, in writing, by the other Contracting Party.
Article 11
Settling of Disagreement
Any disagreement between the Contracting Parties regarding the interpretation or the application of the present Protocol shall be settled through negotiation.
Article 12
Term and Termination
1. The present Protocol is valid for an unspecified term and one of the Contracting Parties can terminate it at any moment.
2. The termination shall take effect six months after the date of notification of the other Contracting Party.
Article 13
Depositary
The present Protocol is deposited with the Ministry of Foreign Affairs of Zaire for the original in the French language and with the Ministry of Foreign and Regional Co-operation of Uganda for the original in the English language to which any amendment shall be immediately transmitted.
Article 14
Implementation
The present Protocol shall come into effect at the date of its signature.
Done at on the in two original documents, one in the French language and the other in the English language, both texts being equally authentic.
FOR THE GOVERNMENT OF THE REPUBLIC OF ZAIRE | FOR THE GOVERNMENT OF THE REPUBLIC OF UGANDA |
Annex 4
PROJECT PROPOSAL 1
A - Title: REGIONAL PROJECT FOR THE MANAGEMENT AND DEVELOPMENT OF FISHERIES IN LAKE EDWARD AND LAKE MOBUTU.
B - Duration: 5 years
C - Location and Head office
The project will be carried out in the lake Mobutu and Lake Edward area. The first and main station of the project for Lake Edward 2 will be located at Mweya/Lake Katwe in Uganda with a small station at Vitshumbi in Zaire, the second and main station for Lake Mobutu, will be located at Kasenyi/Tchomia in Zaire 3, with a small station at Butiyaba in Uganda.
D - Objectives:
Long-term objectives:
To ensure the sustainability of the fisheries resources of Lake Mobutu and Lake Edward through increased knowledge of the fish stocks, and proper management in relation to their ecological and human environment;
to ensure the supply of protein for the population in the area by resource management, controlled exploitation, the reduction of
to ensure the supply of protein for the population in the area by resource management, controlled exploitation, the reduction of post harvest losses and the improvement of the nutritional value of fish products.
Immediate Objectives:
To elaborate and execute a programme for the evaluation of the fisheries resource, (with priority being given to Lake Mobutu);
to develop and support a common programme for the management of the resource which takes environmental issues into consideration, (with priority being given to Lake Edward);
to ensure a rational exploitation of the resource and to contribute towards the valorization of fish products.
E - Justification of the project:
Fishing is a major activity in the lakes of the African Rift Valley. It relies mostly on the use of wooden canoes of which a small proportion is motorized. In 1988, total production from Lake Mobutu and Edward was estimated at approximately 26,400 tons for a potential sustainable catch estimated at 34,500 to 49,000 tons.
The two lakes are shared by Zaire and Uganda with each country managing and exploiting its portion of the fishery.
Recent studies show that one of the lakes, Lake Edward, is already overexploited and that the sustainability of present catch levels may be affected.
Signs of overexploitation have not yet arisen for Lake Mobutu. However, the fast growth of the fishery in this lake requires precise data on its potential because the difference between minimum (21,000 tons per year) and maximum (33,000 tons per year) estimates is too big to implement a meaningful programme for their management. A scientific research project would be required for the two lakes: its results could be helpful for future decisions about the development and the management of fishing activities in these waters.
This is all the more necessary since the riparian populations in both Uganda and Zaire suffer from malnutrition and undernourishment. In the Great lakes region, feeding is based on tubers and leguminous plants and there is a profound lack of animal-based products even if fish could provide a cheap source of animal protein. In 1988, fish was providing approximately 35 % of the animal protein needs in the sub-region.
At the moment, development and management of the resource by the local fisheries authorities is difficult due to a lack of means and equipment. To be efficient, the management of the fishery should be jointly undertaken by the two countries.
At the national level, there are many gaps and biases in the fishery statistics collected on both lakes. Indeed, the lack of information-sharing mechanism and standardized data makes a reliable monitoring of catches and fishing effort impossible.
The bad condition of roads in the region requires that most of the catch be processed for preservation and marketing. The techniques presently used reduce the nutritional value representing significant post harvest losses.
For Lake Edward in particular, stocks are now subject to an exploitation level close to the maximum. This could disrupt the delicate bio-economic equilibrium of the whole fishery (decrease in production, overinvestment, unemployment etc.). In order to reach an optimal exploitation of the fisheries, rational management plans have to be implemented. These should also reduce existing and potential conflicts between different components of the fisheries.
Such policy requires a consensus between the two countries sharing the resource because every management effort independently undertaken by one of them would definitely be doomed to fail. This is especially the case if one considers the delicate bio-economic equilibrium of these fisheries. Indeed, the management of these lakes also affects the bio-economic equilibrium of the natural reserves and parks in the Uganda-Zaire Rift.
In order to examine these questions, a technical consultation on the management of the fishery in Lake Edward and Lake Mobutu was organized by the FAO Regional Project for Inland Fisheries Planning (FAO-IFIP) and the Economic Commission for Africa (ECA-JEFAD). The meeting took place in Kampala from 17 to 21 of September 1990. The main issues discussed concerned statistics, research and management. It was proposed that a special joint commission on fisheries by Zaire and Uganda authorities be established. A draft Protocol of the Commission has already been proposed and finalised.
F - Strategy and brief description of the project:
The project is embedded in the framework of bilateral cooperation between the Uganda and Zaire governments in the field of managing the shared resources of the two countries. It covers the two lakes (Edward and Mobutu) which are part of the lake systems of the Rift Valley. These two lakes were producing around 26,400 tons in 1988. Overall, fishing contributes significantly to the provision of food in the sub-region. It is also one of the main sources of employment; not only the fishing activity itself but also its associated activities.
Action directed towards management of the fishery is essential and the proposed project intends to fill up the present gaps. It is based on a bilateral approach to prevailing conditions in each country and is directed to an effective dialogue between these countries. In order to prevent possible conflicts of interest which could be faced in the implementation of some activities of the project, it will be closely linked up with the existing projects in charge of the management of the natural reserves/parks established on and around these lakes.
Besides the necessity of a joint approach to fisheries management, advantages of implementing such a project at a sub-regional level are: economies of scale, homogeneous training of a team of experts and cadres, harmonization of working methods, the creation of an effective and efficient management regime for the fisheries through a common structure.
At the time of the Technical Consultation, organized by the FAO-IFIP project and the ECA, the two countries decided that it was essential that the management of the fishery resources and the protected areas be organized in a concerted way based on a strengthened bilateral collaboration. The project was therefore conceived as a regional project. However, in order to facilitate its financing and implementation, the tasks proposed below are divided per country.
Objective No. 1 aims at the elaboration and execution of a research programme for stock assessment, and increased knowledge of biotic and abiotic characteristics of the lakes, of the biology of the main commercial fish species and of socio-economic characteristics of the main fisheries. It will be essentially implemented from and coordinated by Uganda.
Objective No.2 deals with management and requires joint execution. However, it is essential that the execution of activities linked up with the different objectives be jointly coordinated.
Objective No. 3 aims at the optimization and valorization of fishing products, and will be implemented from and coordinated by Zaire.
OBJECTIVE No.1: To elaborate and execute a programme for the assessment of the resource and the main fisheries.
Result No.1.1:
A joint research programme for stocks assessment and physical-chemical-biological analyses.
Activity No. 1.1.1: Definition of a research programme for the entire fishery to be executed from the project research centres.
Activity No.1.1.2: Organization of a workshop for training in stock assessment (within the context of UFFRO, Uganda).
Activity No.1.1.3: Collection and compilation of the necessary data for the stock assessment.
Activity No.1.1.4: Organization and execution of experimental fishing campaigns.
Activity No.1.1.5: Conduct of accurate statistical surveys allowing the control of the evolution of the catches.
Activity No.1.1.6: Detailed bathymetric analysis and mapping of banks.
Activity No.1.1.7: Description of the seasonal changes in stratification, inner mixing and currents.
Activity No.1.1.8: Analysis of equilibrium condition of nutritive elements in the underwater and identification of highly productive areas.
Activity No.1.1.9: Biological study of the main commercial species, biological habitat and migratory movements of these species.
Result No.1.2:
A joint program as regards socio economic analyses.
Activity No.1.2.1: Definition of a program of research for the whole fishery to be executed by the project research centres.
Activity No.1.2.2: Organization of a workshop for training in sampling and socio economic statistics (within the context of UFFRO, Uganda).
Activity No.1.2.3: Census of fishermen and assessment of catches, prices and income.
Activity No.1.2.4: Implementation of socio economic surveys on fishing activities, and conversion according to the type of fishery.
Activity No.1.2.5: Implementation of socio economic surveys to assess marketing and export channels.
Activity No.1.2.6: Conduct punctual analyses as required to achieve the objectives of the project, especially with regard to management, assessment of fishing and fish processing techniques, and extension.
Result No.1.3:
Adequate means for the monitoring of fisheries.
Activity No.1.3.1: Establishment and/or reinforcement of structures for the collection of fisheries statistics and socioeconomic data.
Activity No.1.3.2: Identification at bilateral level of policies, methodologies, human and material means required for data collection.
Activity No.1.3.3: Mobilization of the existing expertise and means in the sub-region as regards data collection and training of staff.
Activity No.1.3.4: Setting up of a data collection system at a bilateral level notably made up of standard surveys and a network of enumerators.
Activity No.1.3.5: Supply of equipment (vehicles, weighing scales, etc.) and infrastructures for effective implementation of programmes by field staff in each country.
Activity No.1.3.6: Reinforcement of the surveillance system.
OBJECTIVE No.2: To elaborate and support a joint program for fisheries management with due consideration to environmental issues.
Result No.2.1:
Adequate operation of the Special Joint Commission.
Activity No.2.1.1: Support to the work of the Commission and its working groups.
Result No.2.2
A harmonized fisheries management plan.
Activity No.2.2.1: To elaborate and update a harmonized fisheries management plan with the responsible authorities and other parties concerned.
Activity No.2.2.2: Adoption of the plan by the Special Joint Commission and implementation.
Result No.2.3:
A legislation updated and harmonized based upon scientific findings.
Activity No.2.3.1: Updating of an appropriate legislation in each country and harmonization at the bilateral level.
Activity No.2.3.2: Adoption and implementation of the legislation in each country.
Result No. 2.4:
Periodical meetings held by technical staff and decision- makers of both countries to:
Activity No. 2.4.1: Allow the exchange of information and joint decision-making on the sub-regional issues related to fisheries.
Activity No. 2.4.2: Periodically monitor the implementation of the main activities of the Project.
Result No. 2.5:
Adequate expertise at a national and bilateral level in the area of fisheries management. The training conducted in the context of UFFRO will be supplemented by on-the-job training by expatriate project staff. Experts will in particular train the staff who will be in charge of management (monitoring, control and surveillance).
Activity No. 2.5.1: Identify available staff and their training needs in relation to management, the analysis of information and decision-making at a national and bilateral levels.
Activity No. 2.5.2: To ensure their supplementary training through UFFRO and the Project.
Result No. 2.6:
A strengthened system of control and surveillance.
Activity No. 2.6.1: Evaluation of the present system and revision.
Activity No. 2.6.2: Training of officials in control and surveillance.
Activity No. 2.6.3: Improvement of logistical means at the disposal of the field staff in charge of control and surveillance.
OBJECTIVE No. 3: To ensure a better exploitation of the resource and contribute to a better valorization of the production.
Result No. 3.1:
Improved fishing techniques, notably by the rehabilitation of fishing activities on Lake Mobutu where deep water stocks may be underexploited. Due to the lack of knowledge on the characteristics of these stocks, the exploitation shall be exploratory lakewide and progressive. This activity will be coordinated from the Zairian side.
Activity No. 3.1.1: Construction of 2 whaling boats and 16 associated barges.
Activity No. 3.1.2: To experiment fishing with the whaling boats hauling 8 to 10 barges.
Activity No. 3.1.3: To test nets with large mesh size (7–13cm).
Activity No. 3.1.4: To test improvements of common fishing techniques.
Activity No. 3.1.5: To promote the use of improved techniques within the context of the various measures adopted for the management of the Lake.
Result No. 3.2:
Improved techniques for fish processing, preservation and storage, using appropriate technology.
Activity No. 3.2.1: To test and compare results from different techniques proposed by the project.
Activity No. 3.2.2: To adapt the most profitable techniques to local requirements.
Activity No. 3.2.3: Extension of approved techniques after experimentation.
G - Staff, equipment and infrastructures of the project 1
G1 - National Contributions
National contributions will be balanced and they are globally estimated as indicated here:
STAFF
The host countries will pay salaries for national staff appointed to the project. These will be:
4 senior staff, who shall as counterparts to the expert in management and the expert in fishing technology.
20 field agents in charge of collecting statistics and extension work.
18 staffs trained in biology at UFFRO, and some in socio economics and technology (processing), in charge of the implementation of the programmes under technical guidance of the senior staff of the project.
12 staff in charge of the controlling and enforcing the application of fishing regulations at field level.
4 secretaries
4 mechanics
8 drivers
20 workers
INFRASTRUCTURES
Provision of the existing infrastructures in the afore-mentioned centres of the project.
Building plots for new infrastructures as required by the project.
G2 - Contributions from international organisations:
This part shall be discussed later during a round table conference assembling the potential donors for the purpose of cost sharing either as contributions per country or/and per donor. Sub-programmes corresponding to each objective could also be financed separately.
STAFF
An expert in inland fisheries management as Coordinator of the project. He will be based at Mweya/Katwe in Uganda. Required qualifications: Several years' experience in the field of fisheries management and a good experience in training. His main task will be the implementation of the monitoring and management programme. Term of assignment: 60 months
An expert in fishing technology based in Zaire at Kasenyi/Tchomia. He shall be have the following qualification : Several years' experience in the field of fishing technology and a good experience in training and extension work. His main task will be the implementation of the programme for improved fishing and fish processing technologies, with emphasis on training.
Term of assignment: 48 months
A volunteer in charge of assisting the expert in fishing and fish processing technology. Required academic education: Advanced degree in biology with experience in fishing/or processing technology.
Term of assignment: 48 months
A socio-economist with a solid experience in small scale fisheries research; he will be particularly in charge of conducting socio-economic studies on Lake Mobutu as Lake Edward has been studied within the EEC project for assistance in park management. He will also be in charge of training extension staff. He will be appointed in Zaire at Kasenyi/Tchomia.
Duration of stay: 24 months
A volunteer in charge of assisting the expert in socio-economics in the collection and processing of socio-economic data. Required academic education : An advanced degree in economics and with training or experience in the collection and processing of socioeconomic data.
Term of assignment: 48 months.
An expert in bio-statistics based at Katwe in Uganda specialised in inland fisheries. He will be in charge of the research and statistics programme of the project.
Duration of stay: 48 months
A volunteer in charge of assisting the expert in bio-statistics in the field of data collection and processing of fisheries statistics. Required academic education: An advanced degree in biology with training in data collection and statistics.
Term of assignment: 48 Months
Various consultants: the project will call on consultants for specific problems which may arise during its execution.
12 months of consultation.
INFRASTRUCTURES (First year US$)
Rehabilitation of the existing infrastructures | 60.000 |
4 offices (measurement: 4×100 sq. m at 100 US$ per sq.m) | 40.000 |
10 houses (10×100 sq.m at 100 US$ per sq.m) | 100.000 |
2 fuel oil stations with a tank of 20,000 litres | 40.000 |
4 warehouses for storing fishing equipment (4×60 sq.m at 60 US$ per sq. m) | 16.000 |
3 storehouses for storage of fish processed by the project (3×100 sq.m) | 18.000 |
3 workshops (3×50 sq. m) | 13.000 |
2 main laboratories (2×100 sq.m) | 20.000 |
2 minor laboratories (2×60 sq.m) | 12.000 |
Total | 319.000 |
MISCELLANEOUS (US$)
Training | 100.000 |
Expatriation expenses for nationals working in in neighbouring county, and performance allowance | 220.000 |
Consumable materials for research Fuel, oil, petrol | 400.000 |
Budget for experimentation and extension | 150.000 |
Total | 870.000 |
DURABLE EQUIPMENT (US$)
4 vehicles type R4 | |
4 vehicles 4×4 type Toyota | 40.000 |
Land cruiser and spare parts | 100.000 |
2 fibre glass boats 9m and spare parts | 20.000 |
20 motorcycles 50 plus spare parts | 15.000 |
2 canoes | 40.000 |
2 speed boat engines | 8.000 |
30 life jackets | 20.000 |
30 life buoys | 5.000 |
10 tents | 1.000 |
20 weighing machines | 500 |
10 camp beds | 3.000 |
4 generators | 12.000 |
4 electric pumps | 50.000 |
4 typewriters | 12.000 |
2 photocopiers | 1.400 |
2 micro-computers | 3.000 |
4 portable radios | 6.000 |
8 motorola portable radios | 4.000 |
House and station equipment | 120.000 |
Office and material equipment | 40.000 |
4 air conditioners | 30.000 |
Equipment of laboratories (4) | 80.000 |
Equipment for training | 50.000 |
Equipment for mechanical workshop | 90.000 |
2 whaling boats built locally with a 4mm metal sheet 15m long, 10 horsepower diesel engine plus spare parts; estimated cost | 70.000 |
16 barges built locally; estimated cost | 40.000 |
4 “Altona” ovens | 10.000 |
4 vacuum packing machines | 30.000 |
4 cutters | 12.000 |
6 cutting tables | 4.000 |
2 refrigerators (cap. 350 litres) | 2.000 |
Various materials for fish processing | 10.000 |
2 deep freezers (cap. 500 litres) | 8.000 |
2 refrigerated pick-up trucks cap. 500 kg | 80.000 |
Total | 1.006.900 |
BUDGET CONCERNING INTERNATIONAL CONTRIBUTION
TOTAL | 1991 | 1992 | 1993 | 1994 | 1995 | |||||||
M/H | US$ | M/H | US$ | M/H | US$ | M/H | US$ | M/H | US$ | M/H | US$ | |
Fisheries mngt. expert | 60 | 500,000 | 12 | 100,000 | 12 | 100,000 | 12 | 100,000 | 12 | 100,000 | 12 | 100,000 |
Master fisherman | 48 | 320,000 | - | - | 12 | 80,000 | 12 | 80,000 | 12 | 80,000 | 12 | 80,000 |
Socio-economist | 24 | 160,000 | - | - | 12 | 80,000 | 6 | 40,000 | 6 | 40,000 | - | - |
Consultants | 12 | 144,000 | 2 | 24,000 | 4 | 48,000 | 2 | 24,000 | 2 | 24,000 | 2 | 24,000 |
Sub-total | 144 | 1,124,000 | 14 | 124,000 | 40 | 308,000 | 2 | 244,000 | 32 | 244,000 | 26 | 204,000 |
Administrative support | 60,000 | 12,000 | 12,000 | 12,000 | 12,000 | 12,000 | ||||||
Travel | 50,000 | 10,000 | 10,000 | 10,000 | 10,000 | 10,000 | ||||||
Training | 100,000 | 40,000 | 30,000 | 10,000 | 10,000 | 10,000 | ||||||
Expatriation and performance allowances | 220,000 | 50,000 | 30,000 | 30,000 | 30,000 | 30,000 | ||||||
Total elements | 1,554,000 | 246,000 | 400,000 | 316,000 | 316,000 | 276,000 | ||||||
Durable equipment | 1,006,900 | 700,000 | 306,900 | - | - | - | ||||||
infrastructures | 419,000 | 319,000 | 30,000 | 30,000 | 30,000 | 10,000 | ||||||
Experimentation and extension | 150,000 | 50,000 | 25,000 | 25,000 | 25,000 | 25,000 | ||||||
Operating expenses | 400,000 | 40,000 | 90,000 | 90,000 | 90,000 | 90,000 | ||||||
Total elements | 1,975,900 | 1,109,000 | 451,900 | 145,000 | 145,000 | 125,000 |
LIST OF IFIP REPORTS - LISTE DES RAPPORTS PPEC
I. TECHNICAL DOCUMENTS / DOCUMENTS TECHNIQUES
Gréboval D., A. Bonzon, M. Giudicelli and E. Chondoma, 1989 Baseline Survey Report (1987) on inland fisheries planning, development and management in Eastern/Central/Southern Africa. UNDP/FAO Regional Project for Inland Fisheries Planning (IFIP). RAF/87/099-TD/01/89 (EN): 104p.
Gréboval D., A. Bonzon, M. Giudicelli and E. Chondoma, 1989 Rapport de l'étude de base (1987) sur la plantification, le développement et l'aménagement des pêches continentales en Afrique Orientale/Centrale/Australe. Projet Régional PNUD/FAO pour la Planification des Pêches Continentales (PPEC). RAF/87/099-TD/01/89 (Fr): 110p.
Gréboval D., and B. Horemans (eds), 1989 Selected Papers presented at the SADCC/FAO Training Workshop on Fisheries Planning, Victoria Falls, Zimbabwe, 15–24 Novembre 1988. UNDP/FAO Regional Project for Inland Fisheries Planning (IFIP). RAF/87/099-TD/02/89 (En): 138p.
Horemans B., et Maes M. (éds), 1989 Rapport de la consultation technique sur les lacs Cohoha et Rweru partagés entre le Burundi et le Rwanda (Bujumbura, 13 et 14 Décembre 1989). Projet Régional PNUD/FAO pour la Planification des Pêches Continentales (PPEC). RAF/87/099-TD/03/89 (Fr): 94p.
Gréboval D., 1989 Management of the New Fisheries of Lake Victoria: Major socio-economic issues. UNDP/FAO Regional Project for Inland Fisheries Planning (IFIP), RAF/87/099-TD/04/89 (En): 25p.
Gréboval D. (ed), 1990 Principles of fisheries management and legislation of relevance to the Great Lakes of East Africa: Introduction and case studies. UNDP/FAO Regional Project for Inland Fisheries Planning (IFIP), RAF/87/099-TD/05/90 (En): 41p.
Report of the IFIP/SWIOP Workshop on Economic Aspects of Fisheries Development and Management. 1990 UNDP/FAO Regional Project for Inland Fisheries Planning (IFIP), RAF/87/099-TD/07/90 (En): 22p.
Corsi F., 1990 Evaluation des pêcheries zaïroises des lacs Idi Amin/Edouard et Mobutu Sese Seko. Projet Régional PNUD/FAO pour la Planification des Pêches Continentales (PPEC). RAF/87/099-TD/08/90 (Fr): 64p.
Corsi F., 1990 Evaluation of the Zairian Fisheries of Lakes Edward and Mobutu. UNDP/FAO Regional Project for Inland Fisheries Planning (IFIP), RAF/87/099-TD/08/90 (En): 60p.
Rapport de la première réunion du Comité consultatif du projet régional pour la planification des pêches continentales. 1990 Projet Régional PNUD/FAO pour la Planification des Pêches Continentales (PPEC). RAF/87/099-TD/09/90 (Fr): 24p.
Report of the First Meeting of the Advisory Committee of the Regional Project for Inland Fisheries Planning. 1990 UNDP/FAO Regional Project for Inland Fisheries Planning (IFIP), RAF/87/099-TD/09/90 (En): 22p.
Report of the Symposium on Socio-economic aspects of Lake Victoria Fisheries. 1990 A Symposium organized by the IFIP Project under the framework of the CIFA Sub-committee for Lake Victoria, 24–27 April, Kisumu, Kenya, UNDP/FAO Regional Project for Inland Fisheries Planning (IFIP), RAF/87/099-TD/10/90 (En): 24p.
Maes M. (ed), 1990 Report on the Technical Consultation on Lake Mweru shared by Zaire and Zambia, 08–10 August, Lusaka, Zambia, UNDP/FAO Regional Project for Inland Fisheries Planning (IFIP), RAF/87/099-TD/11/90 (En): 44p.
Maes M. (éd), 1990 Rapport de la Consultation technique sur le lac Mweru partagé par le Zaïre et la Zambie, 08–10 août, Lusaka, Zambie, Projet Régional PNUD/FAO pour la Planification des Pêches Continentales (PPEC). RAF/87/099-TD/11/90 (Fr): 45p.
Papers presented at the IFIP/SWIOP Workshop on Economic Aspects of Fisheries Development and Management. 1990 UNDP/FAO Regional Project for Inland Fisheries Planning (IFIP), RAF/87/099-TD/12/90 (En): 122p.
Case studies presented at the IFIP/SWIOP Workshop on Economic Aspects of Fisheries Development and Management. 1990 UNDP/FAO Regional Project for Inland Fisheries Planning (IFIP), RAF/87/099-TD/13/90 (En): 115p.
Report of the Workshop on Fisheries Statistics and Information Systems for Lake Victoria, 26–29 June 1990, Kampala, Uganda, UNDP/FAO Regional Project for Inland Fisheries Planning (IFIP), 1990 RAF/87/099-TD/14/90 (En): 72p.
Rapport de la consultation Technique sur l'aménagement des pêcheries des lacs Edouard et Mobutu, 17–21 septembre 1990, Kampala, Ouganda, Projet Régional PNUD/FAO pour la Planification des Pêches Continentales (PPEC). 1990 RAF/87/099-TD/15/90 (Fr): 30p.
Report of Technical Consultation on Management of the Fisheries of Lakes Edward and Mobutu, 17–21 September 1990, Kampala, Uganda, UNDP/FAO Regional Project for Inland Fisheries Planning (IFIP), 1990 RAF/87/099-TD/15/90 (En): 26p.
Report of the National Workshop on Fishery Statistics and Information Systems, 22–26 October 1990, Addis Ababa, Ethiopia, UNDP/FAO Regional Project for Inland Fisheries Planning (IFIP), 1990 RAF/87/099-TD/16/90 (En): 33p.
Machena C. and V. Kanondo, 1991 A Review of the Fisheries of Lake Kariba and their Management. UNDP/FAO Regional Project for Inland Fisheries Planning (IFIP). RAF/87/099-TD/17/91 (En): 58p.
Rapport de la deuxième réunion du Comité consultatif du project régional pour Report of the Second Meeting of the Advisory Committee of the Regional Project for Inland Fisheries Planning. 1991 UNDP/FAO Regional Project for Inland Fisheries Planning (IFIP). RAF/87/099-TD/18/91 (En): 23p.
Prado J., Beare R.J., Siwo Mbuga J., Oluka L.E. 1991 A catalogue of fishing methods and gear used in Lake Victoria. UNDP/FAO Regional Project for Inland Fisheries Planning (IFIP). RAF/87/099-TD/19/91 (En): 104p.
Biribonwoha A.R. 1991 A Review of Fisheries Inputs in Kenya, Tanzania and Uganda. UNDP/FAO Regional Project for Inland Fisheries Planning (IFIP). RAF/87/099-TD/20/91 (En): 65p.
Rapport de la deuxième Consultation technique sur l'aménagement des pêcheries des lacs Edouard et Mobutu Sese Seko. 1991 Projet Régional PNUD/FAO pour la Planification des Pêches Continentales (PPEC). RAF/87/099-TD/21/91 (Fr): 27p.
Report of the Second Technical Consultation on the Management of the Fisheries of lakes Edward and Mobutu, 27–29 May 1991, Kinshasa, Zaire. 1991 UNDP/FAO Regional Project for Inland Fisheries Planning (IFIP). RAF/87/099-TD/21/91 (En): 28p.
Leendertse, K. and B. Horemans. 1991 Socio Economic Characteristics of the Artisanal Fishery in Kigoma region, Tanzania. UNDP/FAO Regional Project for Inland Fisheries Planning (IFIP), RAF/87/099-TD/22/91 (En): 104p.
II. WORKING PAPERS / DOCUMENTS DE TRAVAIL
Bean C.E., 1989 Selected abstracts of basic references and current literature in fisheries economics. UNDP/FAO Regional Project for Inland Fisheries Planning (IFIP), RAF/87/099-WP/01/89 (En): 51p.
Ssentongo G. W., 1990 Fish and fisheries of shared lakes of Eastern/Central/Southern Africa. UNDP/FAO Regional Project for Inland Fisheries Planning (IFIP), RAF/87/099-WP/02/90 (En): 19p.
Nfamara J.D., 1990 Recent observations on the fisheries of lake Tanganyika. UNDP/FAO Regional Project for Inland Fisheries Planning (IFIP), RAF/87/099-WP/03/90 (En): 16p.
Proceedings of the Symposium on Socio-economic aspects of Lake Victoria Fisheries. Volume 1 (unedited papers 1–7). 1990 UNDP/FAO Regional Project for Inland Fisheries Planning (IFIP), RAF/87/099-WP/05/90 (En): 114p.
Nfamara J.D., 1990 Improved method for smoking fish in the Kigoma region of Lake Tanganyika, Tanzania. UNDP/FAO Regional Project for Inland Fisheries Planning (IFIP), RAF/87/099-WP/06/90 (En): 23p.
Proceedings of the Symposium on Socio-economic aspects of Lake Victoria
Fisheries. 1991 Volume 2 (unedited papers 8–12). UNDP/FAO Regional
Project for Inland Fisheries Planning (IFIP), RAF/87/099-WP/07/91
(En): in preparation.
Fisheries Planning (IFIP), RAF/87/099-WP/06/90 (En): 23p.
Proceedings of the Symposium on Socio-economic aspects of Lake Victoria Fisheries. 1991 Volume 2 (unedited papers 8–12). UNDP/FAO Regional Project for Inland Fisheries Planning (IFIP), RAF/87/099-WP/07/91 (En): in preparation.
Gréboval D. et Diquelou J., 1991 Expérimentation de la senne tournante et coulissante dans les eaux burundaises du lac Tanganyika: Etude de pré-faisabilité. Projet Régional PNUD/FAO pour la Planification des pêches Continentales (PPEC). RAF/87/099-WP/08/91 (Fr): 20p.
Maes M., Leendertse K. et Mambona Wa Bazolana, 1991 Recensement des unités de pêche zaïroise dans la partie nord du lac Tanganyika. Projet Régional PNUD/FAO pour la Planification des Pêches Continentales (PPEC). RAF/87/099-WP/09/91 (Fr): 61p.