1. Type of ponds based on source of water supply
Springwater ponds, seepage water ponds, ponds fed by rainwater or run-off, ponds fed by water courses and tide-fed ponds; barrage ponds and diversion ponds - rosary or linked ponds and parallel ponds.
2. General layout of pond farms
Ponds (nursery, rearing, holding, brood, catching, transition or stunting ponds); water control structures (dikes, canals, sluices, monks and pipes); and supporting facilities (road bridges, culverts, workshop, stores, farmhouses, etc.).
3. Planning of farm layout
Preparation of farm layout plan, including water control system, based on physical features of the area, climatic conditions and requirements of farm management (production of fingerlings, table fish from either fry stage or fingerling stage); calculation of area required for nursery space; proportion of nursery ponds to production ponds, proportion of rearing pond area for different stages of rearing and area of holding ponds; determination of shape, size and depth of ponds; advantages of small and large ponds; optimum size of ponds for small-, medium- and large-scale culture operations; arrangement for adjustment of water level and salinity range of individual ponds in coastal farms.
4. Preparation of work plan
Quantification of input requirements; cash estimates; organizing supply of materials, labour and machinery; preparation of work schedule.
5. Site survey
Preparation of contour map; marking out the farm area; survey instruments required - levelling instrument with levelling staff, direct reading tachymeter with staff, theodalite, optical square, bevel protractor, tape and marking staff.
6. Site clearance
Clearance of vegetation from farm site by underbrushing, withering, felling and burning; removal of stumps; collection and later utilization of surface organic deposits as fertilizer or for facing embankments.
7. Design and construction of water control structures
7.1 Water control structures
Water gates and canals, levees or perimeter dikes and subsidiary dikes.
7.2 Basic principles for design
Calculation of water requirements; filling and drainage of pond farms; use of pumps, gravitation and/or tidal force for water supply and drainage.
7.3 Basic data required
For all farms - topography, soil properties, water supply, evapo-transpiration, seepage, magnitude of floods, rainfall, storms and cyclones; for coastal farms only - tidal characteristics and range, river discharge, ground elevation and designed datum level.
7.4 Design and construction of dikes
Determination of height, top width and base width of dikes; slope of dike in relation to soil type and function; construction of dike foundation and wall; measures for maintenance of foundation stability; excavation of core trench and core puddling in case of unsuitable soils; protection and stabilization of dikes - planting of vegetation, use of plastic sheets, bituminous emulsions, concrete, asbestos and timber reinforcements or wire mesh reinforcements; provision of roadways on dikes.
7.5 Levelling and sealing of pond bottom
Levelling of pond bottom, providing slope toward the outlet in case of flatland; sealing of the pond bottom to prevent seepage; materials used for sealing - clay lining, polyethylene or rubber lining, gley or biological plastic, bentonite clay and chemical sealants; construction of drainage ditches on pond bottom to facilitate drainage.
Excavation of elevated sites or portions of pond sites; filling depressions or deep portions; methods of closing natural waterways at some sites or enclosing project area(s).
7.6 Design and construction of water gate structures
Main gate, secondary gates (division boxes) and tertiary gates; their dimensions in relation to volume of water intake and drainage; structure of main gate - tide-stream wing walls (in coastal farms), side walls, bed protection, sill and abutments; construction procedure; materials used.
Different types of inflow and outflow installations employed in individual ponds - Rivaldi valve, elbow joints, bottom water outflow, double sluice overflow, inlet pipes, sluices and monks; types of pipes used - earthenware, concrete, iron, polythene, PVC, asbestos, etc.; installation of overflow pipe or construction of spillway; location and size of spillway.
Construction of diversion canal for diversion of excess or flood waters.
Different types of filters used with water control structures - wire screen, nylon mesh or cloth bag, sand or gravel, saran fibre, etc.
8. Pumps used in fish farms
Type of pump - piston, impeller, water-ram, Archimedean screw; lift, delivery, sludge and submersible pumps; freshwater and saltwater pumps; driving units - electric, diesel and petrol; their horsepower and delivery rates; suction and delivery pipes; foot valves; maintenance of pumps and simple repairs; possible use of wind power or other inexpensive sources of power for pumping.
9. Machinery used in farm construction
Earth-moving machinery - rooters, bulldozers, scrapers, excavators, draglines, clam digger, suction dredgers, crawler (caterpillar), hydraulic ditchers, backhoe, cranes, loaders, and rubber tractors, dumpers, tip trucks and sand pumps.
Earth-packing machinery - rubber rollers, vibrator rollers, road rollers, diesel rams and sheepsfoot rollers.
Construction machinery - electric, diesel and petrol concrete mixers, vibrators, driving rigs and conveyor belts.
Power, working capacity, fuel consumption and running costs of different types of machinery; high capital cost; possibility of contract hire, period hire or cooperative ownership.
10. Economic aspects of pond farm construction
Practicals
Survey of potential sites using land survey instruments; preparation of contour map; calculation of earth work; design of sluices; equipment used in construction; construction of typical pond farms; cost estimates for the construction of selected farms.