Table 1: Basic Statistics of FAO Assisted Groups
1986: |
Figures extracted from April 1986 project records. |
1989: |
Information based on researcher interviews with groups and
examination of group records, where available. |
1986: |
Figures extracted from April 1986 project records. |
1989: |
Information based on researcher interviews with groups and
visits to project sites. |
1985 Yield: |
Figures extracted from April 1986 project records. |
1989 Yield: |
Upland and swamp rice yields estimated by multiplying the
number of bushels planted by the average expected yield. Figures for average
expected yield supplied by MANRF/Pujehun. Estimates were cross-referenced with
groups and agro-technicians estimates and found to be
consistent. |
1989 Price Per Unit: |
1989 farm gate prices supplied by MANRF/Pujehun. |
Projected 1989 Income: |
1989 yield multiplied by 1989 price. |
Number: |
Number of projects undertaken by PPP groups. Figures for
1986-1989 based on reports from groups and verified during visits by researcher.
Figures for 1982-1986 taken from project records at MRDSSY/Pujehun. |
Estimated Cost of Projects: |
Estimated costs for BPRDP and BPRWSSP assisted projects taken
from BPRDP and BPRWSSP standard design costing plans. Other project cost
estimates are taken from group records. All costs expressed in 1989
Leones. |
Value of Local Contribution: |
BPRDP estimates that the value of local contribution to its
projects is approximately one half the cost of projects. Local contribution
generally consists of timber, sand, stone, skilled and unskilled labor. BPRWSSP
requires a standard local contribution of Le. 4000 cash from groups it assists;
local labor and material contributions for well projects are minimal and
therefore not included. Figures for other projects are based on group records
and include only cash outlays. |
Number of Groups: |
Information based on researcher interviews with
groups. |
Number: |
Total number of projects groups said they planned to
undertake. These projects are in various stages of preparation. Local labor and
materials have begun and funding mobilized for some. Others have applied for
assistance, while the remainder are only being discussed. |
Estimated Cost of Projects: |
Same as Tables 4 and 5. |
Value of Local Contribution: |
Same as Tables 4 and 5. |
Savings: |
1986 savings extracted from April 1986 project records and
expressed in 1989 Leones. 1989 savings were extracted from group records. In
cases when groups were reluctant to release figures, savings levels were
estimated through indirect questioning. |
Active Bank Accounts: |
Number of groups holding active accounts at Barclays
Bank/Pujehun. 1986 figures drawn from April 1986 project records, 1989 figures
supplied by groups. |
Group Treasuries: |
Number of groups holding money in the village with group
treasurers. 1986 figures drawn from April 1986 project records, 1989 figures
supplied by groups. |
PPP Position: |
Information based on project records. |
Current Position: |
Information based on researcher interviews with former
staff. |
Number of Groups: |
Total number of groups listing constraint as a response to
open ended questioning by researcher. |
Number of Groups: |
Total number of groups listing contacts with corresponding
agencies during group interviews with researcher. |
Pujehun: |
Figures based on results of researchers interviews with
groups and staff, and MRDSSY/Pujehun office records. |
Bo: |
Figures supplied by MRDSSY/BPRDP staff in Bo. Figures were
only available for two of fourteen chiefdoms, although groups are believed to be
operating throughout the district. |
Moyamba: |
Figures supplied by Foday Mansaray, Farmers Associations
Officer, FAO Inland Valley Swamp Development Project, Moyamba. |
Kailahun: |
Figures supplied by Lawrence Buani, SDW, Coordinator of Small
Farmers and Community Development Initiatives, MRDSSY/Kailahun. |