Previous Page Table of Contents Next Page


NARRATIVE

The investigations started off the Indus delta on 4 June and was finished at the Iranian border on 12 June. The area between the 15-20 m depth-contour line out to 5-10 nautical miles off the slope of the continental shelf was covered with transects about 10-15 nautical miles apart (Figure 1).

The distance sailed with the number of stations worked were as follows:

Sailing distance:

1970

nautical miles

Hydrographical Stations:

21


Pelagic trawl hauls

11


Bottom trawl hauls

30



Weather conditions were good, but with the south-west monsoon producing a heavy swell during most of the survey. Instruments and gears functioned satisfactorily.


Previous Page Top of Page Next Page