Related items
Showing items related by metadata.
-
Book (stand-alone)Water accounting in the Nile River Basin
WaPOR Water Accounting series
2020Also available in:
No results found.This report describes the water accounting study for the Nile River Basin carried out by IHE-Delft using the Water Productivity (WaPOR) data portal of the Food and Agricultural Organization (FAO). The Nile River Basin faces a huge challenge in terms of water security. With an expected doubling of the population in the basin in the next twenty-five years, water supply in the basin will be further depleted as demands for agriculture, domestic and industry continues to grow. Water availability in the basin will also be threatened by climate change and variability and pollution from increased agricultural and industrial activities and from urban areas. However with limited up-to-date ground observations, in terms of duration, completeness, and quality of the hydro-meteorological records it is difficult to draw an appropriate picture of the water resources conditions. The Water Accounting Plus (WA+) system designed by IHE Delft with its partners FAO and IWMI has been applied to gain full insights into the state of the water resources in the basin. -
Book (stand-alone)Water Accounting in the Litani River Basin
WaPOR Water Accounting reports
2019Also available in:
No results found.This report provides the water accounting study for Litani River basin in Lebanon carried out by IHE Delft using the Water Productivity open data portal (WaPOR) of the Food and Agricultural Organization (FAO). The Litani River basin is one of the key river basins in Lebanon and it is experiencing water scarcity with annual renewable water resources being 606.9 mm3/yr. With an estimated population of 375 000 in 2010 and doubled by 2016 due to the Syrian refugee crisis, the total per capita water availability is around 800 m3/cap/yr indicating water shortage. Increasing challenges such as growing population, climate change, groundwater over-exploitation and inter-basin transfers have put the available water resources in the basin under stress. The completeness and quality of the hydro-meteorological records are insufficient to draw an appropriate picture of the water resources conditions. However, the Water Accounting Plus (WA+) system designed by IHE Delft with its partners FAO and IWMI has been applied to gain full insights into the state of the water resources in the basin for the period 2010 to 2016. The WA+ framework is a reporting mechanism for water flows, fluxes and stocks that are summarized by means of WA+ sheets. -
Book (stand-alone)Water accounting in the Awash River Basin
WaPOR water accounting reports
2020Also available in:
No results found.This report provides the water accounting study for Awash River basin in Ethiopia carried out by IHE-Delft using the Water Productivity (WaPOR) data portal of the Food and Agricultural Organization (FAO). The Awash River Basin is the most utilized river basin in Ethiopia hosting most of the industrial activities in the country, a number of small to large scale irrigation schemes and the main population centres of the country with more than 18.6 million people (2017 estimate). The basin faces high water stress during the peak of the irrigation season and frequent flooding in rainy seasons. The Water Accounting Plus (WA+) system designed by IHE Delft with its partners FAO and IWMI has been applied to gain full insights into the state of the water resources in the basin for the period 2009 to 2018. The WA+ framework is a reporting mechanism for water flows, fluxes and stocks that are summarized by means of WA+ sheets. The role of land use and land cover on producing and consuming water is described explicitly.
Users also downloaded
Showing related downloaded files
No results found.