Related items
Showing items related by metadata.
-
DocumentWinDASI - Software for Cost-Benefit Analysis of Investment Projects. A Case Study on Crop Intensification and Coffee Plantation 2005
Also available in:
No results found.This module presents a case study in Cost-Benefit Analysis (CBA) of an investment project. It is useful for people who wish to improve their skills in financial and economic analysis and it is particularly suitable as a practical application of the FAO software for Cost-Benefit Analysis “WinDASI”. The exercise consists of a brief description of the project, a guideline for the structuring of project data and of an appendix with the project data. -
DocumentWinDASI: a Software for Cost-Benefit Analysis of Investment Projects. Calculations Performed by the Software 2005
Also available in:
No results found.This module illustrates how to carry out cost-benefit calculations of investment projects in WinDASI, after data are inserted in the database. It explains, by means of a step-by step procedure, how to calculate: a) flows of physical quantities of outputs, inputs and investment items; b) flows of current, discounted and cumulative costs, benefits, and net benefits; c) flows of incremental (With-Without project) current, discounted and cumulative net benefits; and e) project indicators such as the Net Present Value (NPV), the Internal Rate of Return (IRR), the Benefit/Cost Ratio, (BCR), the Switching Values (SVs) and Sensitivity Analysis. Instructions are provided on how to carry out calculations for the different components of an investment project, notably: plans, zones and projects (i.e. at different levels of aggregation). In addition, this module addresses normal and phased mode of calculation and comparisons of different projects alternative scenarios (with–project versus without-p roject). -
DocumentWinDASI: a Software for Cost-Benefit Analysis of Investment Projects. Inserting and Managing Data 2005
Also available in:
No results found.This module explains how data should be organized and entered into the WinDASI software to run Cost-Benefit Analysis (CBA) of investment projects. In particular, as regard as data entry, it illustrates how the “components” window works. After, it shows the facilities the program has to check for mistakes, such as data omitted or entered incorrectly. In the last part of this module, it is explained how to manage project data, such as saving and loading project data.
Users also downloaded
Showing related downloaded files
No results found.