Thumbnail Image

Some Aspects of Fisheries and their Development in Man-Made lakes in Indonesia with Special Reference to Lake Jatiluhur, West Java





Also available in:
No results found.

Related items

Showing items related by metadata.

  • Thumbnail Image
    Document
  • Thumbnail Image
  • No Thumbnail Available
    Project
    South China Sea fisheries development and coordinating programme. Water supply of the Fishery Development Centre in Freshwater Aquaculture at Sukabumi, West Java, Indonesia 1977
    Also available in:
    No results found.

    The early drilling of a well at the present Centre, about 30 cm in diameter, or larger if practicable, and up to 150 metres in depth is recommended as an interim measure to effect an urgently needed improvement in dependable water supply at the Centre. If the target yield of 11 liters/second, or more, is realized and water quality is satisfactory, then an appropriate size pump should be selected based on drawdown tests. The pump would be powered by electric power from the City of Sukabumi with s tandby power provided at the Centre. Relocation of the Centre to the upper foothill locations of Mt. Pangrano characterized by the Halimun Valley and Batukarat locations is strongly recommended for more detail engineering study. Sites with the desired 200 liters/second capacity appear available with minimum impact on existing paddy irrigation. Alternatively the survey could also look into the possibility of using other existing Directorate General Fisheries freshwater projects outside Sukabumi . Pipeline diversion of an upland flow to the Centre, which has been previously considered is not recommended because of adverse social and economic impacts on existing rice farms. The possibility of FAO/UNDP assistance with various elements of implementing a new water supply and improving the Centre should be considered in the 1978 IPF as a preproject activity of the proposed Fisheries Extension Project 1979–1982. The estimated UNDP requirement in 1978 is $70,000, as indicated in ANNEX 3. T he corresponding counterpart funding to cover drilling of a well, installation of pumps and motor, and comprehensive site surveys should be provided.

Users also downloaded

Showing related downloaded files

No results found.