No Thumbnail Available

Cruise Report Dr. Fridtjof Nansen - Second Fisheries Resource Survey in Tanzania, (16 June - July 1982









Also available in:
No results found.

Related items

Showing items related by metadata.

  • No Thumbnail Available
  • No Thumbnail Available
    Project
    Preliminary Cruise Report Dr. Fridtjof Nansen - Second Fisheries Resource Survey Pakistan, 20 January - February 1984 1984
    Also available in:
    No results found.

    The research vessel “Dr. Fridtjof Nansen” is scheduled to undertake several fishery resources surveys in the North Arabian Sea during 1983-84. These investigations are part of the UNDP/FAO Global Programme GLO/82/001. The first cruise in Pakistani waters under this programme was carried out in September 1983. The survey programme included acoustical survey for the purpose of mapping fish distribution and abundance estimation, trawling for identification of echo recordings, biological sampli ng and hydrographic observations. “Dr. Fridtjof Nansen” carried out similar surveys in Pakistani waters during the North Arabian Sea Programme in 1975-76 and during the Joint NORAD/Pakistan Project from January to June 1971. The results from these investigations have been presented in cruise reports as well as in summary reports. The present survey was carried out during the period 19 January to 2 February 1984. Cruise tracks and the stations worked out appear in Figure 1. The sci entific staff consisted of the following: From Institute of Marine Research, Bergen, Norway:
  • No Thumbnail Available
    Project
    Cruise Report Dr. Fridtjof Nansen - Fisheries Resource Survey Pakistan, 2-12 June 1984 1984
    Also available in:
    No results found.

    Under the UNDP/FAO Global Programme (GLO/82/001) the fishery research vessel “Dr. Fridtjof Nansen” has carried out several surveys in the North Arabian Sea during 1983-84. The third cruise in Pakistan waters under this project was carried out in June 1984. The vessel entered the western Pakistan border on 2 June at 2200 hours on its way to Karachi, and terminated the cruise at the same border on 12 June 0900 hours. The local scientists from the Marine Fisheries Department, Karachi, entered the vessel in Karachi on 3 June, and left the vessel in Gwadar on June 11.

Users also downloaded

Showing related downloaded files

No results found.